Similar Projects
Fireproofing
Alteration
Post-Bid
Coeur d'Alene, ID 83814

National Interagency Fire Center 110 - Great Basin Training Fire Suppression Replace
Renovation
Post-Bid
$250,000 CJ est. value
Boise, ID 83705

Acoustic Mitigation Isolation, Phase 1
Renovation, Alteration
Results
$2,400,000 est. value
Moscow, ID

VIPR I-BPA for Water Handling for The West Zone (Regions 3, 5, 6, & 10)
Infrastructure
Results

HVAC and Fire Sprinkler Upgrade
Alteration
Post-Bid
$2,228,000 est. value
Orofino, ID 83544

Fire System Replace
Renovation, Demolition, Term Contract
Results
$500,000 to $1,000,000 est. value
Boise, ID 83705

Install Fire Suppression System
Renovation
Results
$204,650 CJ est. value
Moscow, ID 83844

Last Updated 08/26/2022 09:34 AM
Project Title

RFQ D/B - Student Union Building (SUB) Fire Alarm Replacement

Physical Address View project details and contacts
City, State (County) Boise, ID 83706   (Ada County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $936,700 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope ofwork includes the replacement ofthe existing Pyrotonics 3MXL fire alarm system in its entirety at the Student Union Building at Boise State University. It also includes removing components and wiring ofthe existing system. The existing system is beyond its useful life. BSU's standard fire alarm panel currently is the "EST3" Edwards Fire alarm system. In addition to controlling the building fire alarm devices, it's also currently used for mass notification for campus security needs and emergency incidents. Upgrades will include new panels, devices and wiring as required throughout the building. BSU will perform panel programming. Any damage to existing finishes due to device removal and / or installation will require to be patched, repaired, replaced, and /or painted to match adjacent surfaces. The facility is occupied and will remain occupied during the installation of the new system and removal of the old system. Occupant safety and property protection will need to be maintained per current adopted code requirements and will be the responsibility ofthe Design-Build Team. Project location does not include SPEC Building that is connected to the SUB via hallway. DPW is requesting proposals for a Design-Builder who will be a team player, who will work closely and in harmony with DPW and Boise State University, and be proactive with the design and construction processes (design phases, construction phasing, Division of Occupational and Professional Licenses plan reviews/permitting, early bid packages, identify long lead items). The Design-Build team will be required to provide all services as per the standard DPW Design-Build Agreement and be licensed as required for the design and construction work. All questions must be sent to the DPW Project Manager: Lindsay Erb, Project Manager Division ofPublic Works 502 N. 4th St. PO Box 83720 Boise ID 83720-0072 (208)332-1911 Lindsay.erb@adm.idaho.gov Funding for the project is from the Agency (BSU). The Division of Public Works (DPW) will administer the project according to the terms and conditions ofthe award, State laws and guidelines. The Design-Build team will receive general instructions through the State. A Project Manager from DPW will be assigned to serve as project manager and liaison between the Department of Administration, the Agency, and the Design-Build team. The Design-Builder is required to provide Programming/Pre-Design, Design Development, Construction Documents, and Construction. All required building survey work shall be the responsibility ofthe Design-Build Team. The Design-Build team shall make a minimum of one (1) presentation to the Permanent Building Fund Advisory Council and shall keep in mind that during all phases, code compliance, energy efficiency, and building maintenance concerns should be incorporated into the design. Negotiate Contract August 2022 Substantial Completion August 2023

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents