Similar Projects
Edwardsville USD 204 Edwardsville Elementary School Roof Recover
Alteration
Bidding
Edwardsville, KS 66111

Lamar Pump Station Roof Replacement
Alteration
Bidding
Overland Park, KS 66207

Roof Replacement and Masonry Repair at Kansas Aviation Museum Phase II
Alteration
Post-Bid
Wichita, KS 67211

Canning Creek Shelter Roof Replacement - Various Locations
Alteration
Post-Bid
$25,000 to $100,000 est. value
Council Grove, KS 66846

Custer Hall North Wing Roof Replacement
Results
$185,000 est. value
Hays, KS 67601

JCL Cedar Roe Library - Sloped Roofing Replacement
Results
Roeland Park, KS

Hutchinson Animal Shelter Roof Replacement Project
Alteration
Bidding
Hutchinson, KS 67501

Roof Repairs for Fire Stations 4 and 7
Alteration
Post-Bid
Topeka, KS 66606

Geology Planning Reroof
Results
$200,000 est. value
Topeka, KS 66606

Royal Valley Elementary School - Roof Replacement
Alteration
Post-Bid
Hoyt, KS 66440

Beaumont Safety Rest Area Reroof
Results
$70,000 est. value
Beaumont, KS

Former High School Building Roof Repair/Replacement
Alteration
Post-Bid
Greensburg, KS

Roofing
Alteration
Results
Topeka, KS 66607

Indoor Community Arena Re-Roof Installation
Alteration
Post-Bid
Lawrence, KS 66046

Roofing at Health Department
Alteration
Results
Topeka, KS 66606

Last Updated 04/08/2022 02:55 PM
Project Title

2022 Edwardsville City Hall Roof Project

Physical Address View project details and contacts
City, State (County) Edwardsville, KS   (Wyandotte County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of furnishing all labor, materials, equipment, tools, supervisions, and other facilities necessary to perform the project in accordance with the plans and specifications. Please include separate bid prices for Phase 1 and Phase 2 as they may be selected individually. The work includes, but is not limited to the following: Phase 1- Tear off existing roofing and install new roof drains, and install a 60 mil TPO system (approx. 4,500 SF). Include unit pricing for metal deck repair. Additional specs on page 3.Phase 2- Tear off existing composite shingles around the entire City Hall building parapet, remove any shake shingles that may be present under composite shingles. Replace any areas where decking has rotted, and install ice and water shield. Install CertainTeed Landmark laminated composition shingles, color selected by owner. Include unit pricing for wood deck repair. Additional specs. On page 4

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents