Similar Projects
Metro Business and Space Center
New Construction, Infrastructure - 112,258 SF
Conception
$12,100,000 CJ est. value
Rogers, AR 72758

Yates Farm
New Construction, Infrastructure
Conception
$28,300,000 CJ est. value
Rogers, AR 72758

Rogers Ped. Impts. (TAP-19) (S)
Infrastructure
Design
$500,000 CJ est. value
Rogers, AR 72756

Highway 16 Residential Subdivision
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Siloam Springs, AR 72761

VBT Runway Widening - ReBid
Infrastructure
Bidding
$2,000,000 CJ est. value
Bentonville, AR 72712

Police Training Facility
New Construction, Infrastructure
Bidding
$1,650,000 CJ est. value
Bentonville, AR 72713

Siloam Springs New Administration Building
New Construction, Infrastructure - 20,399 SF
Sub-Bidding
$6,000,000 CJ est. value
Siloam Springs, AR 72761

Construction of AWIN Tower Site Work Designs
Infrastructure
Post-Bid
Little Flock, AR

Lost Bridge Village Treatment Facilities Improvements
New Construction
Post-Bid
$2,000,000 est. value
Garfield, AR

NACA Wastewater Treatment Plant Improvements
Renovation
Results
$300,000 est. value
Bentonville, AR

McReynolds Recreational Vehicle Park
New Construction
Construction
Siloam Springs, AR 72761

Champions Medical Building
New Construction, Infrastructure, Alteration - 47,700 SF
Construction
$27,700,000 est. value
Rogers, AR 72758

The Haven
New Construction, Infrastructure - 3,620 SF
Pending Verification
$9,000,000 CJ est. value
Bentonville, AR 72712

Centerton Boulevard Commercial Development
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Centerton, AR 72719

8th Street Commercial Buildings
New Construction, Infrastructure
Conception
$5,800,000 CJ est. value
Rogers, AR 72758

Last Updated 08/02/2022 11:16 AM
Project Title

Biosolids Purchase and Removal

Physical Address View project details and contacts
City, State (County) Rogers, AR 72758   (Benton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Rogers Water Utilities (RWU) of Rogers, Arkansas is seeking proposals to purchase and remove Class A biosolids ("biosolids") from the Rogers Pollution Control Facility (RPCF). More information about RWU, the biosolids at RPCF, and qualifications needed, are contained in the Request for Proposals (RFP). RWU anticipates awarding contracts for biosolids purchase and removal to at least two firms, one of which will have priority for purchasing and removing biosolids. RWU reserves the right to accept the proposals that appear from all considerations to be in the best interest of RWU. In determining and evaluating the best proposals, the prices offered for purchase of the biosolids will not necessarily be controlling, but reliability, efficiency, expertise in handling biosolids, and reputation will be considered, along with other relevant factors and criteria. The complete list of factors and criteria to be considered, and complete list of requirements, will be contained in the RFP. The actual award of a contract is contingent on approval of the Rogers Waterworks and Sewer Commission. Requests for information regarding this RFP must be submitted in writing by e-mail or letter no later than July 18, 2022 to the contact above. RWU may elect to not answer questions submitted after said date. Questions and answers will be sent to all registered bidders no later than July 22, 2022. RWU reserves the right to cancel this RFP process, reject any and all submissions, to waive technicalities, formalities, and/or informalities, and to accept any submission deemed to be in the best interests of RWU.

Details

Division 02 - Existing Conditions, Hazardous Material Assessment, Subsurface Investigation, Site Remediation, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents