Similar Projects
Capitol Building Redevelopment
New Construction - 20,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Washington, DC

St Elizabeths East - Phase II
New Construction - 256,000 SF
Conception
$10,000,000 CJ est. value
Washington, DC

Randall School Redevelopment Phase I
New Construction, Renovation - 32,707 SF
Design
$65,000,000 est. value
Washington, DC 20024

Meridian International Redevelopment
New Construction - 9,266 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Washington, DC 20009

LBJ Consolidation & Switchgear
Renovation - 198,369 SF
Bidding
$5,000,000 to $15,000,000 est. value
Washington, DC 20024

Leroy Place Offices
Renovation - 5,134 SF
Post-Bid
Washington, DC 20008

Pension Benefit Guaranty Corporation Offices
Renovation - 433,000 SF
Post-Bid
Washington, DC 20024

7th Floor Spec Suite
Renovation - 4,520 SF
Results
Washington, DC 20005

2100 L Street Offices
New Construction, Renovation - 380,000 SF
Construction
$47,250,000 est. value
Washington, DC 20037

The Gantry
New Construction - 674,005 SF
Construction
$10,000,000 CJ est. value
Washington, DC 20002

Freedom Forum
Build-Out - 26,000 SF
Pending Verification
Washington, DC 20001

The Sheppard Lounge
Renovation, Build-Out - 900 SF
Pending Verification
Washington, DC 20010

Buzzard Point - Phase II
New Construction
Conception
Washington, DC 20003

FreedomWorks Offices
Renovation - 8,980 SF
Design
$300,000 est. value
Washington, DC 20002

Meininger Hotel
New Construction - 74,500 SF
Post-Bid
Washington, DC 20001

Reported 05/27/2021 10:50 AM
Project Title

20 Massachusetts Avenue

Physical Address View project details and contacts
City, State (County) Washington, DC 20001   (District of Columbia County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service, Hotel/Motel, Office
Contracting Method
Project Status Permitting, Construction Start Expected May 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Office, 8 Stories Above Grade, 535,000 SF Renovation, Hotel/Motel, Food/Beverage Service.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Countertops, Furnishings and Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 14 - Conveying Equipment, Commissioning of Conveying Equipment, Commissioning of Elevators.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents