Similar Projects
Morrills Corner - State Route 302 and 100
Alteration
Conception
Portland, ME 04101

MPI DOT Paving Stevens Avenue - City of Portland
Infrastructure
Conception
$450,000 CJ est. value
Portland, ME 04103

Stroudwater Apartments
New Construction, Infrastructure - 45,000 SF
Design
$13,000,000 CJ est. value
Westbrook, ME 04092

Carr Woods
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Cape Elizabeth, ME 04107

High Street Water Main Replacement
Infrastructure
Bidding
$597,132 CJ est. value
Windham, ME 04062

2022 Bond - School Construction Projects - Cape Elizabeth School Department
New Construction, Infrastructure
Post-Bid
$115,900,000 CJ est. value
Cape Elizabeth, ME 04107

RFP Construction Manager at Risk - Front Street Redevelopment Construction Manager at Risk
Infrastructure
Post-Bid
$43,460,000 CJ est. value
Portland, ME 04103

Interstate 295 Southbound Over State Route 703 and Interstate 295 Southbound Over Westbrook Street Bridge Joints
Results
Less than $1,677,000 est. value
South Portland, ME 04106

Andrews Square Intersection Improvements
Results
$400,000 est. value
Portland, ME

Stevens Square at Baxter Woods Apartments / Portland
New Construction, Infrastructure
Construction
$60,800,000 CJ est. value
Portland, ME 04103

York Street Mixed-Use Renovation
Renovation, Infrastructure - 9,620 SF
Construction
$5,000,000 CJ est. value
Portland, ME 04101

Summit Community Church
New Construction, Infrastructure - 28,000 SF
Pending Verification
$8,000,000 CJ est. value
Gorham, ME 04038

Cummings Road Cannabis Cultivation Facility
New Construction, Infrastructure - 23,940 SF
Pending Verification
$2,500,000 CJ est. value
South Portland, ME 04106

Fore Street Sewer Separation - City of Portland
Infrastructure
Conception
$2,000,000 CJ est. value
Portland, ME 04101

St John Street Apartments
New Construction, Infrastructure - 10,726 SF
Design
$3,000,000 CJ est. value
Portland, ME 04102

Last Updated 01/09/2023 02:11 PM
Project Title

Cottage Road Pedestrian and Safety Improvements + Mill and Overlay

Physical Address View project details and contacts
City, State (County) South Portland, ME 04106   (Cumberland County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,924,878 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The lowest responsive bidder must have completed, or successfully complete, a Highway or ProjectSpecific prequalification through the Maine Department of Transportation to be considered for the award of this contract. The Cottage Road Pedestrian and Safety Improvements + Mill and Overlay is located along Cottage Road beginning at intersection of Highland Avenue and extending east 0.98 miles. The work includes: Mill and overlay, construction of new concrete sidewalk with associated curb, drainage, and other incidental work. Contract shall be awarded to the responsible bidder whose bid, complying with conditions and requirements provided in this Notice and Bid Form, is the lowest total bid as identified on the Bid Form. The contractor shall make note of the schedule requirements presented in the contract documents. The City has established a start date any time after April 10, 2023. The project shall be Complete, including finish pavement by October 20, 2023. To be considered a responsive Bidder, the Contractor shall have obtained one set of plans and specifications electronically (PDF format) from the Engineer (Sebago Technics). A link to download the plans may be obtained by contacting Shane Kelly at skelly@sebagotechnics.com or (207)-200-2078. The bid will not be awarded to the Bidder unless a record for obtaining documents from the Engineer exists in the office of the Engineer. A bid must be accompanied by Bid security made payable to Owner in an amount of 5% of Bidder's maximum bid price and in the form of a certified check or Bid bond issued by surety meeting the requirements of the General Conditions. No bid may be withdrawn for at least 60 days after receipt of bids unless released by the Owner. The successful bidder must furnish within 10 calendar days after the Notice of Award the required number of copies of the signed Agreement, 100% Performance Bond, 100% Payment Bond, Insurance Policy and begin execution of this contract within 10 calendar days following the Notice to Proceed. The General Contractor shall be responsible for the full amount the 100% Performance Bond and the 100% Payment Bonds. Combining bonds of subcontractors is not acceptable. The Municipality reserves the right to reject any or all bids. MEDOT - Cottage Road Sidewalk and Pedestrian Safety Improvements

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents