Similar Projects
2020 Bond - Police / Justice Center Expansion - City of Orange Beach
New Construction
Conception
$10,000,000 est. value
Orange Beach, AL

The Gables On Lawrence
New Construction, Infrastructure
Conception
$51,000,000 CJ est. value
Fairhope, AL 36532

Skyline Village Townhomes
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fairhope, AL 36532

Orange Beach Medical Plaza
New Construction, Infrastructure - 11,000 SF
Design
$6,400,000 CJ est. value
Orange Beach, AL 36561

New Sidewalk Along County Road 49 (Magnolia Street)
Infrastructure
Bidding
$650,000 CJ est. value
Loxley, AL 36551

Christian Brothers Automotive - US-90 / Daphne
New Construction, Infrastructure - 5,810 SF
Bidding
$1,200,000 CJ est. value
Daphne, AL 36526

Country Club Drive Water Main Replacement Phase A- Wedgewood Drive to Fairway
Infrastructure
Post-Bid
$300,000 CJ est. value
Daphne, AL 36526

Site Development and Construction of East Terminal Building at H.L. "Sonny" Callahan Airport
New Construction, Infrastructure
Post-Bid
Fairhope, AL 36532

Career Tech Academy - (Site Package Only)
New Construction
Results
$4,763,000 est. value
Loxley, AL 36551

Site Preparation and Prescribed Burns
Infrastructure
Results
Gulf Shores, AL

Beef O' Bradys / Spanish Fort
New Construction, Infrastructure - 6,000 SF
Construction
$2,000,000 CJ est. value
Spanish Fort, AL 36527

Aldi / Daphne
New Construction, Infrastructure
Pending Verification
$3,500,000 CJ est. value
Daphne, AL 36526

Palmetto Ridge Townhouses
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Gulf Shores, AL 36542

Waterway Village Pedestrian Bridge - City of Gulf Shore
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Gulf Shores, AL 36542

The Noble at Daphne
New Construction, Infrastructure
Design
$32,000,000 CJ est. value
Daphne, AL 36526

Last Updated 04/05/2023 09:45 AM
Project Title

Daphne Justice Center Expansion - City of Daphne

Physical Address View project details and contacts
City, State (County) Daphne, AL 36526   (Baldwin County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Capitol/Court House/City Hall, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A more detailed scope is expected to be released on a future date. As of April 4, 2023, this project is in the conceptual phase. Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents