Similar Projects
Greenhouse Road Drainage Improvements 2019
Post-Bid
Less than $80,000 est. value
Sandwich, MA

Supply Precast Box Culvert
Post-Bid
Falmouth, MA 02540

Conant Street and Montello Street Water Main Replacement And Drainage Improvements
Results
Less than $550,000 est. value
Provincetown, MA

Beach Sand Re-Nourishment
Term Contract
Results
Less than $40,000 est. value
Brewster, MA

Annual On-Call Drainage Construction Services-2021
Term Contract
Post-Bid
$167,000 est. value
South Dennis, MA

2020 Roadway and Drainage Improvements on Various Roads Project
Results
Less than $1,200,000 est. value
Hyannis, MA 02601

Drainage Improvements - Robbins Hill Road
Results
Less than $175,000 est. value
Brewster, MA 02631

Chapoquoit Road Seawall and Revetment Repair 2020
Results
Less than $650,000 est. value
Falmouth, MA 02540

2020 Barnstable Hollow Field Stone Wall Renovation
Results
$75,000 est. value
Hyannis, MA 02601

Drilling IDIQ in Massachusetts and Rhode Island
Results

Repair Waterfront at USCG Station
Results
$1,000,000 to $5,000,000 est. value
Provincetown, MA 02657

Crosby Lane Salt Marsh Restoration and Stormwater Treatment Project
Results
Brewster, MA

2020 FY21 Drainage Various Locations Project
Results
Less than $1,100,000 est. value
Hyannis, MA 02601

Drainage Improvements on Laurel Lane
Results
Less than $190,000 est. value
Sandwich, MA

Drainage Construction Various Locations
Results
$134,618 est. value
Yarmouth, MA 02664

Reported 11/19/2020 12:00 AM
Project Title

Earthworks Services

Physical Address View project details and contacts
City, State (County) Buzzards Bay, MA 02532   (Barnstable County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 10/28/20
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of earthworks services to construct and operate a dewatering basin for salt water dredge spoils at Monument Beach in Bourne including coordination with The Barnstable County (hydraulic) Dredge for the dredging of Little Bay. The contractor will be responsible for management of all land-side activities to include earthworks to construct and operate the dewatering basin, onsite stockpiling of sediment (or trucking to nearby storage site) and cleanup / beach grading. The estimated volume of dredge material is approximately 18,000 cubic yards. Start date is expected for December 1st unless the Barnstable County Dredge is delayed and project is estimated to have a 3+/- week duration.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents