Similar Projects
Little Rock Pond - City of Charlotte
Infrastructure
Conception
$1,100,000 est. value
Charlotte, NC 28263

Boardwalk Replacement at Weymouth Woods Sandhills Nature Preserve
Infrastructure
Bidding
$300,000 CJ est. value
Southern Pines, NC 28387

Hugh M. Cummings High School Track Replacement and Stormwater Rehabilitation
Infrastructure
Bidding
$500,000 CJ est. value
Burlington, NC 27217

Franklin Correctional Center Firing Range Trailer
Term Contract, Demolition, Infrastructure
Sub-Bidding
$35,000 CJ est. value
Bunn, NC 27508

RFQ Contractor - Residential Asbestos Abatement Services
Term Contract, Infrastructure
Sub-Bidding
$250,000 CJ est. value
Raleigh, NC 27601

New DHHS Campus - Demolition and Abatement Package
Demolition, Term Contract
Post-Bid
Raleigh, NC

Demolition, Lot Cleaning and Asbestos Abatement
Demolition, Alteration
Post-Bid
Fayetteville, NC 28301

Optimist Park Community Center Gymnasium Asbestos Abatement
Results
Raleigh, NC 27609

Property Abatement Services
Alteration
Results
NC

Demolition, Lot Cleaning & Asbestos Abatement
Term Contract, Demolition, Infrastructure
Sub-Bidding
$200,000 CJ est. value
East Fayetteville, NC 28301

Lead-Based Paint Testing Services and Asbestos Testing Services
Infrastructure
Post-Bid
Lumberton, NC

Demolition and Abatement Earnest Jones Property
Demolition, Alteration
Results
$73,200 est. value
Apex, NC 27523

Cameron Hall 2nd Floor Renovation First-Tier Subcontractor Prequalification
Renovation
Sub-Bidding
$765,000 CJ est. value
Winston Salem, NC 27101

Lot Cleaning, Asbestos Abatement, and Demolition
Demolition, Alteration
Post-Bid
Fayetteville, NC 28301

Lot Cleaning, Asbestos Abatement and Demolition
Demolition, Alteration
Results
Fayetteville, NC 28312

Last Updated 05/01/2023 10:38 AM
Project Title

RFP - Right-of-Way Tree and Stump Removal

Physical Address View project details and contacts
City, State (County) Durham, NC 27701   (Durham County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $52,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Deadline for Submitting Written Questions Date, Time and Location: Monday, March 27, 2023 by 2:00 Pm Est to Glenn.slaton@durhamnc.gov Request for Proposal (RFP) for tree and stump removal activities inside the city limits of Durham in accordance with all applicable Occupational Safety and Health Administration (OSHA), International Society of Arboriculture (ISA), Tree Care Industry Association (TCIA), North Carolina Department of Transportation (NCDOT), and the Manual on Uniform Traffic Control Devices (MUTCD) roadside work zone safety requirements. The initial term of this contract will be for 120 days after the notice to proceed. The MUBE goal is 0% and the WUBE goal is 0% on this bid.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents