Similar Projects
Skilcraft Expansion
Addition, Infrastructure - 22,000 SF
Conception
$8,400,000 CJ est. value
Hebron, KY 41048

Caliber Collison - Abercrombie and Associstion
New Construction, Infrastructure - 14,704 SF
Design
$4,000,000 CJ est. value
Walton, KY 41094

Caliber Collison - Abercrombie and Associstion
New Construction, Infrastructure - 14,704 SF
Design
$4,000,000 CJ est. value
Walton, KY 41094

Boone County Schools Paving Improvements 2021
Post-Bid
KY

Shelby/Girard/Oblique Street Improvements
Alteration
Post-Bid
Less than $305,000 est. value
Florence, KY

Baseball Field Backstop Safety System
Results
Union, KY 41091

Beemon Lane Sidewalk/Conrad Lane Sidewalk/Idlewild Road Multi-Use Path
Results
Burlington, Florence, KY 41042

Turfway Foodmart
Addition, Demolition, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Florence, KY 41042

Turfway Foodmart
Addition, Demolition, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Florence, KY 41042

Langley Bullock Industrial Development / Hebron
New Construction, Infrastructure - 230,000 SF
Design
$123,510,000 CJ est. value
Hebron, KY 41048

Intelligent Classroom Installation
Renovation
Post-Bid
Elsmere, Erlanger, KY 41018

2021 Resurfacing
Results
Less than $168,000 est. value
Walton, KY 41094

Limaburg Road at KY 18 Intersection Improvements
Infrastructure
Post-Bid
$700,000 est. value
Aberdeen, Burlington, KY 41005

Asphalt Resurfacing
Results
KY

2022 Walton Streets
Infrastructure
Post-Bid
$459,000 est. value
Walton, KY

Last Updated 08/24/2022 10:33 AM
Project Title

Walton-Verona Intermediate School

Physical Address View project details and contacts
City, State (County) Verona, KY 41092   (Boone County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $11,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a new school for fourth and fifth grade students. As of August 24, 2022, an architect has been selected, and the drawings are in the late design phase. Advertisement for bidding is anticipated to occur in late September or early October 2022. A timeline for construction has yet to be announced.

Details

1 Story Above Grade, 51,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents