Similar Projects
ISU Lecture Center: Chiller Replacement
Renovation
Design
$195,000 CJ est. value
Pocatello, ID 83209

Air Handling Unit Installation Project
Alteration
Post-Bid
Burley, ID

Replace Chiller, Data Room
Alteration
Post-Bid
$179,000 est. value
Boise, ID 83702

Magic Valley Regional Airport - Terminal Heat Pump Replacement
Alteration
Results
Twin Falls, ID 83301

Acoustic Mitigation Isolation, Phase 1
Renovation, Alteration
Results
$2,400,000 est. value
Moscow, ID

HVAC and Fire Sprinkler Upgrade
Alteration
Post-Bid
$2,228,000 est. value
Orofino, ID 83544

Dehumidification Replacement
Alteration
Results
Idaho Falls, ID

NWB Shoshone Outbuildings - 50% CD
Alteration
Post-Bid
Preston, ID

Center Chiller Replacement
Alteration
Results
$360,000 est. value
Boise, ID 83725

Replace Roof and Upgrade HVAC Units, Canyon County Center,College of Western Idaho
Alteration
Post-Bid
$765,000 est. value
Nampa, ID 83651

Boise Airport Chiller Addition
Alteration
Results
Boise, ID 83705

Advantage Plus Credit Union Boiler Replacement
Renovation
Post-Bid
$400,000 CJ est. value
Pocatello, ID 83201

City Hall Annex - HVAC
Alteration
Results
Boise, ID 83702

Latter-day Saints (LDS) Shoshone 1, 2 HVAC Replacement
Alteration
Post-Bid
$200,000 est. value
Shoshone, ID 83352

Cold Storage Maintenance
Term Contract
Results
Coeur d'Alene, ID 83815

Last Updated 02/16/2023 05:42 PM
Project Title

D2 Materials Lab Remodel - Bid Package 3

Physical Address View project details and contacts
City, State (County) Lewiston, ID 83501   (Nez Perce County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

BP-03 (FM22235) HVAC The project scope includes an interior renovation, providing additional laboratory areas, upgraded HVAC and ventilation, and other miscellaneous improvements. The Owner reserves the right to reject any or all bids, waive any informality or irregularity, and award a contract that is deemed in the best interest of the Owner. This is a Construction Management Project. Bids for separate work packages must be on the bid form enclosed in the bid documents and accompanied by a certified or cashier's check of an Idaho Bank, or bid bond, with Idaho State Licensed Surety Company as surety, in an amount not less than 5% of the total bid made payable to: Idaho Transportation Department. The security shall be forfeited by the bidder in event of failure to sign the contract or furnish the required Payment and Performance Bond. Performance and Payment Bonds in the amount of (100%) of the Contract amount will be required within (10) days after receipt of a properly prepared agreement between the Owner and the Contractor. Costs for bonds shall be included in contractor's bid amount. Contractors shall be licensed in the State of Idaho in accordance with the provisions of the Idaho Public Works Contractors' State License Law.

Details

8,665 SF.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents