Similar Projects
Pearl Street Apartments
New Construction, Infrastructure
Conception
$8,000,000 CJ est. value
Denver, CO 80203

Towneplace Suites and Fairfield Inn by Marriott / Denver
New Construction, Infrastructure
Design
$25,100,000 CJ est. value
Denver, CO 80204

56th Avenue & Tower Road Mixed-Use Development
New Construction - 1,971,664 SF
Design
Denver, CO 80249

2022 Wastewater Infrastructure Program Support
Infrastructure
Bidding
$3,300,000 CJ est. value
Denver, CO 80202

2022 Wastewater Infrastructure Program Support
Infrastructure
Bidding
$3,300,000 CJ est. value
Denver, CO 80202

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

High Point North Early Grading Project
Infrastructure
Post-Bid
Denver, CO 80249

East 64th Avenue and Denali Street Infrastructure Project
Results
Denver, CO 80202

NW and SW Aquatic Habitat Design-Build Projects
Results
Less than $350,000 est. value
Denver, CO

Sheridan Station Mile High Development
New Construction - 138,566 SF
Construction
$10,000,000 est. value
Denver, CO 80214

Block 176
New Construction, Demolition - 767,123 SF
Construction
Denver, CO 80202

Humboldt Street Apartments
New Construction, Infrastructure - 5,300 SF
Pending Verification
$56,000,000 CJ est. value
Denver, CO 80218

Kabin 2.0 North and South Buildings
New Construction, Infrastructure - 119,123 SF
Pending Verification
$38,400,000 CJ est. value
Denver, CO 80216

Our Lady of the Lourdes School - Phase II
New Construction, Infrastructure - 21,000 SF
Design
$1,000,000 CJ est. value
Denver, CO 80210

2022 Citywide ADA Ramp and Concrete Repair Phase 4
Infrastructure
Bidding
$2,750,000 CJ est. value
Denver, CO 80202

Last Updated 09/21/2022 12:19 PM
Project Title

Tennessee and Oneida Storm System, Phase 1

Physical Address View project details and contacts
City, State (County) Denver, CO 80202   (Denver County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Park/Playground, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $7,085,529 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Est. Value Notes: Between $5,700,000 and $6,300,000 This project will construct the downstream end of the Tennessee & Oneida Storm System project, which will improve ponding and localized flooding at the sump in S. Oneida St just north of Tennessee Ave. This first phase of construction will remove and replace the outlet structure of Lollipop Lake in Garland Park, replace the culvert across Cherry Creek Drive North and rebuild the outfall into Cherry Creek. Phase 1 will also build the downstream end of a new storm system pipe network, which will outfall into Garland Park and convey stormwater runoff into Lollipop Lake via a graded and landscaped swale. The new stormdrain will come out onto S Kearney St and make the turn eastward onto Mississippi Ave, where the storm system improvements will terminate for Phase 1. Denver Parks will also make improvements around Lollipop Lake, which will include minor grading, landscaping and irrigation improvements. 13% MWBE PREQUALIFICATION REQUIREMENTS: Each bidder must be prequalified in category 1E(4) PIPED SEWER at or above the $9,000,000.00 monetary level. Deadline to Submit Questions: April 8, 2022 at 10:00 A.M., local time. Please submit questions to DOTI.Procurement@denvergov.org. Multiple Location Are Available In This Project SCOPE OF WORK A. The work shall consist of installation, monitoring and testing of compaction grouting within the limits indicated on the Drawings to meet the acceptance criteria presented in within these specifications. B. In connection with the compaction grouting program, as shown on the drawings, the grouting contractorshall provide all labor, materials and equipment as detailed in the contract documents and within the Measurement and Payment to accomplish the work: Between $5,700,000 and $6,300,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PTN - PWWW2019-006

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents