Similar Projects
Foothill Road: Dry Creek to Vilas Reconstruction - Jackson County
Infrastructure
Conception
$4,200,000 CJ est. value
Medford, OR 97504

Foothill Road: Dry Creek to Vilas Reconstruction - Jackson County
Infrastructure
Conception
$4,200,000 CJ est. value
Medford, OR 97504

Southern Oregon Seismic Slopes Stability
Infrastructure
Design
$8,700,000 CJ est. value
Medford, OR 97501

Southern Oregon Seismic Slopes Stability
Infrastructure
Design
$8,700,000 CJ est. value
Medford, OR 97501

2022 Misc Overlays
Infrastructure
Post-Bid
White City, OR

Ashland Municipal Airport Taxiway Reconstruction and Rehabilitation
Infrastructure
Post-Bid
$1,875,390 CJ est. value
Ashland, OR 97520

East Vilas Road Widening
Infrastructure
Results
White City, OR

Pine and Hamrick Intersection Improvements
Infrastructure
Results
$700,000 to $1,200,000 est. value
Central Point, OR 97502

Good Nite Place Mixed Use
New Construction, Infrastructure - 4,800 SF
Construction
$10,000,000 CJ est. value
Talent, OR 97540

Good Nite Place Mixed Use
New Construction, Infrastructure - 4,800 SF
Construction
$10,000,000 CJ est. value
Talent, OR 97540

Tower Business Park Town Homes
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Medford, OR 97504

New Jackson County Jail - County Of Jackson
New Construction, Infrastructure
Pending Verification
$166,000,000 CJ est. value
Medford, OR 97501

South Stage Road Improvements - STA 1824 - City of Medford
Infrastructure
Conception
$2,000,000 CJ est. value
Medford, OR 97501

Stewart Market Phases 1 & 2
New Construction, Infrastructure - 4,060 SF
Design
$19,000,000 CJ est. value
Medford, OR 97501

Interstate 5 MP 28-27 Paving
Infrastructure
Post-Bid
OR

Last Updated 05/16/2023 10:05 AM
Project Title

2023 Street Slurry Seal Project

Physical Address View project details and contacts
City, State (County) Ashland, OR 97520   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $379,379 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 15, 2023, the project has been awarded. Construction is expected to commence July 5, 2023 and be completed by July 16, 2023. Obtained BT. apparent bidder Doolittle Construction LLC $310,712,23 VSS International Inc. $378,000 Intermountain Slurry Seal Inc. $319,448.79 All Bids received prior to the due date and time and in proper form will be publicly opened and read in the Siskiyou Conference Room at the time set forth above as the deadline for receipt of bids, and thereafter Bids, shall be made available for public inspection. If the total amount of the contract exceeds $100,000, the award of the contract must be approved by the Local Contract Review Board. A contract for the work will be awarded or Bids may be rejected, separately or entirely, within thirty (30) days after Bid opening. Bidders shall pre-qualify as provided by ORS Chapter 279C.430 and in accordance with the Standard Specifications for Public Works Construction, Oregon Chapter of APWA, for all classes of construction. Pre-qualification applications must be received by the City of Ashland five (5) days prior to the date designated for the opening of the bids. All projects in excess of $50,000.00 require the Contractor to pay prevailing wage rates. The contract resulting from this solicitation will require the successful Bidder to comply with Oregon's Prevailing Wage Rates. The installation of approximately 137,000 square yards of Emulsified Asphalt Slurry Seal Surfacing. The Statement of Work, including the delivery schedule for the Work, is contained in the Contract Documents *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents