Similar Projects
Electric Car Charging Station
Design
Rutland, VT 05701

Message Switch and Associated Technologies
Bidding
Montpelier, VT

Repair/Upgrade Base Electrical Distribution System - Vermont Air National Guard Base
Bidding
$1,000,000 to $5,000,000 est. value
South Burlington, VT

Portable Generators and Light Poles
Post-Bid
Montpelier, VT

Fairbanks Museum And Planetarium - Electrical Grid And Weather Forecasting Resiliency
Post-Bid
$330,000 est. value
Saint Johnsbury, VT 05819

Group-Net-Metered Photovoltaic Electricity Generation
Results
Bolton, VT

Z--Tiered Evaluation Pre-Solicitation Notice White River Junction Replace Underground Utilities Construction Project
Results
$5,000,000 to $10,000,000 est. value
White River Jct, White River Junction, VT 05009

Town and Community Solar PV Project
Post-Bid
Hinesburg, VT

On-Call Electrical Services
Term Contract
Results
Bennington, VT 05201

Generator Replacement - Castleton Elementary School
Post-Bid
Bomoseen, VT 05732

EV Charging Station
Results
Richmond, VT 05477

Lyndon Town School Generator Power System
Post-Bid
Lyndon, VT

Generator for 4A Pump Station
Results
Castleton, VT 05735

2020 Emergency Generator Project
Post-Bid
Norwich, VT

Contois Auditorium Audio and Electrical Upgrades
Results
Burlington, VT 05401

Last Updated 12/28/2020 03:14 PM
Project Title

NSL Replace the Electrical Conduits

Physical Address View project details and contacts
City, State (County) Springfield, VT   (Windsor County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the following Scope: Remove and replace the existing telephone cable extending from the project office along overhead utility poles through the conduit system to the gatehouse. Remove and replace the existing power conductors extending from the utility transformers to the gatehouse. Remove and replace the existing conduits under the spillway access bridge to include pull boxes, expansion joints, and hangers. Remove and replace the existing strong motion power and communication conduits from the pull box to approximately ten feet past the point of burial. Remove associated disconnect switch. Remove existing abandoned conduit and associated conductors if present. Remove and replace the existing power, instrumentation and communication conduits from the dam crest abutment to the gatehouse. These conduits are affixed underneath the service bridge.

Details

Division 26 - Electrical, Common Work Results for Electrical, Raceway and Boxes for Electrical Systems, Conduit for Electrical Systems.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents