Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Highway Safety Improvement Program HSIP 8 Oakland Hills
Infrastructure
Post-Bid
Oakland, CA

Imola Ave and SR-29 Express Bus Improvements Project
Infrastructure
Post-Bid
$2,600,000 est. value
Napa, CA 94559

East Blithedale Rehabilitation Project - Phase I
Alteration
Results
$3,000,000 est. value
Mill Valley, CA

Downtown Rehabilitation Project - Phase II
Alteration
Results
$600,000 to $800,000 est. value
Mill Valley, CA

Province at San Gabriel Condominiums
New Construction, Build-Out, Infrastructure - 195,000 SF
Construction
$20,000,000 est. value
San Gabriel, CA 91776

Roadway Repairs
Infrastructure
Post-Bid
Cloverdale, Fremont, CA 95425

County of Placer - 2021 Roadway Surface Treatments
Alteration
Results
CA

Construction Pine Flat Road Repair Project
Infrastructure
Post-Bid
CA

SB1 Road Maintenance Projects at Various Locations, FY 2020-2021
Infrastructure
Results
Hollister, CA

South Loop Project
Infrastructure
Post-Bid
Santa Clara, CA 95134

Paradise Road Pavement Rehabilitation
Infrastructure
Results
$1,900,000 est. value
Modesto, CA 95351

Roadway Excavation, JPCP and Furnish Polyester Concrete Overlay
Infrastructure
Post-Bid
$22,300,000 est. value
CA

Removal and Replacement of Concrete within the Public Right-Of-Way
Infrastructure
Results
San Jose, CA

Last Updated 06/15/2022 01:14 AM
Project Title

Place Hot Mix Asphalt (Type A) and Replace AC Surfacing

Physical Address View project details and contacts
City, State (County) CA   (Tehama County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The DVBE Contract goal is 3 percent. 0001 070030 Lead Compliance Plan Ls Lump Sum 0002 090100 Time-Related Overhead (Wday) Wday 25 0003 120090 Construction Area Signs Ls Lump Sum 0004 120100 Traffic Control System Ls Lump Sum 0005 120152 Temporary Pavement Marking (Tape) Sqft 260 0006 120204 Portable Radar Speed Feedback Sign System Day Ea 50 0007 128652 Portable Changeable Message Sign (Ls) Ls Lump Sum 0008 129161 Automated Flagger Assistance Device Day Ea 50 0009 130100 Job Site Management Ls Lump Sum 0010 130200 Prepare Water Pollution Control Program Ls Lump Sum 0011 141120 Treated Wood Waste Lb 800 0012 190185 Shoulder Backing Ton 2,810 0013 390095 Replace Asphalt Concrete Surfacing Cy 400 0014 390132 Hot Mix Asphalt (Type a) Ton 7,380 0015 394060 Data Core Ls Lump Sum 0016 397005 Tack Coat Ton 33 0017 398200 Cold Plane Asphalt Concrete Pavement Sqyd 1,230 0018 820151 Object Marker (Type l-1) Ea 2 0019 832006 Midwest Guardrail System (Steel Post) Lf 550 0020 839584 Alternative In-Line Terminal System Ea 2 0021 839752 Remove Guardrail Lf 650 0022 840515 Thermoplastic Pavement Marking Sqft 260 0023 840560 Thermoplastic Traffic Stripe (Sprayable) Lf 128,000 0024 846035 Remove Thermoplastic Pavement Marking Sqft 260

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents