Similar Projects
Z--INDE 236306-Replace Chiller Plants/Cooling Towers
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Philadelphia, PA 19106

Automatic Temperature Control Repair
Alteration
Bidding
Philadelphia, PA

BOILER SERVICE/REPAIR AND WATER TREATMENT
Post-Bid
Philadelphia, PA

Computer Room Upgrades - USBC
Post-Bid
Philadelphia, PA 19106

Design-Bid-Build (DBB), Building 633 River Water Cooling System, Philadelphia Naval Business Center (PNBC), Philadelphia, PA
Results
$5,000,000 to $10,000,000 est. value
Philadelphia, PA 19092

Machine Chiller Semi-Annual Preventative/Corrective Maintenance for NFPC
Results
Philadelphia, PA 19112

HVAC and Mechanical Products
Term Contract
Post-Bid

Chillers and Hotwater/Glycol Pipeline Replacement at Northeast Water Pollution Control Plant
Results
$4,000,000 to $5,000,000 est. value
Philadelphia, PA 19137

Bldg. 592 Mezzanine Ventilation Design & Installation
Post-Bid
$500,000 to $1,000,000 est. value
Philadelphia, PA

HVAC Maintenance/Repairs - Branches and Regionals
Term Contract
Results
Philadelphia, PA

Heat Pump Condenser
Post-Bid
Philadelphia, PA

Exhibit Hall AHU 12A and Thru 14A and B Replacements
Results
Philadelphia, PA

Bldg 4 Rooftop Chiller Removal and Replacement
Post-Bid
Philadelphia, PA

Hose New Flyer 5996895 A/C Drain
Results
Less than $25,000 est. value
Philadelphia, PA

Silverliner V HVAC Units
Post-Bid
Philadelphia, PA

Last Updated 04/20/2022 09:36 AM
Project Title

Z2da--Site Preparation For Electrospinner

Physical Address View project details and contacts
City, State (County) Philadelphia, PA   (Philadelphia County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work consists of providing all labor, materials, and equipment to perform the tasks outlined in the Statement of Work Site Preparation for Electrospinner at the Corporal Michael J Crescenz, VAMC Philadelphia, PA. The contractor shall abide by all federal state, and local code/regulations/standards. Contractor shall supply all necessary tools, labor, equipment, materials, and supervision required to prepare site for installation of electrospinner located at Corporal Michael J. Crescenz Veterans Affairs Medical Center. (a) Prepare and install ductwork to exhaust electrospinner into atmosphere i. Extraction tube to electrospinner must have a diameter of 10 cm ii. Provide and install all firestopping iii. Install VA-provided filter (b) Perform study to determine usability of existing exhaust fan i. If existing fan not usable, provide and install new exhaust fan with capacity of at least 15 cfm (c) Provide and install wall-mounted bracketing for 5 gas cylinders

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents