Similar Projects
Comprehensive Infrastructure for Tampa’s Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

I-75 MLK DDI
Bidding
FL

Eastport Road Force Main Extension
Bidding
Jacksonville, FL 32214

Resurface Pavement
Renovation
Post-Bid
Inverness, FL 34450

St. Joseph Peninsula State Park Roadway Project
Post-Bid
Port Saint Joe, FL 32456

NE 2nd Way Roadway Improvements
Results
Trenton, FL 32693

CR 236 Widening and Resurfacing
Results
Less than $693,313 est. value
FL

2021 Road and Bridge Paving Program
Bidding
$7,909,024 est. value
Port Charlotte, FL

US 301 Bloomingdale
Post-Bid
FL

Bayou Drive Shoulder Repair
Results
FL

Pre-Event Emergency Roadside Assistance Services
Bidding

NE 154th Street Resurfacing
Post-Bid
FL

Picayune Strand Restoration Project, Miller Tram and Road Removal and Associated Works, Collier County, FL
Results
$9,000,000 to $14,000,000 est. value
FL

Pre-Event Emergency Roadside Assistance Services
Bidding

Cons-Palmave/0908
Post-Bid
Punta Gorda, FL

Last Updated 03/30/2021 08:45 AM
Project Title

Construction Management at Risk Services (CMAR) for the Bonded Transportation Program (BTP) Group #2 Projects

Physical Address View project details and contacts
City, State (County) Green Cove Springs, Middleburg, FL 32043   (Clay County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The three projects under CMAR Group # 2 are: Project #2 - CR 209 from US 17 to CR 315 B Improvements will consist of widening the existing two lane rural roadway to a four lane urban roadway with bike paths and sidewalks. These modifications will require coordination with the FDOT and CSX railroad. It is anticipated that the turning movement on CR 209 at the intersection of CR 315 B will determine the extent of the project. Project #5 – CR 220 Baxley Road to West of Henley Road Improvements will consist of widening the existing two lane rural roadway to a four lane urban roadway with bike paths and sidewalks. This project will require coordination with the adjacent intersection improvement at Henley Rd (FDOT Funded). Project #6A – FCC CR 315 to Hwy 17 Improvements will consist of widening the existing two lane rural roadway to a four lane urban roadway with bike paths and sidewalks. These modifications will require coordination with the FDOT and CSX railroad. Time is of the essence for these projects; therefore, it is a requirement that the Final Construction must be completed by the following not to exceed dates: Project #2 - CR 209 from US 17 to CR 315 B = March 18, 2024 Project #5 – CR 220 Baxley Road to Henley Road = October 2, 2024 Project #6A – FCC CR315 to Hwy 17 = July 31, 2024

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents