Similar Projects
Water, Sanitary and Drainage Facilities in Harper`s Preserve Sections 20-A & 20-C
Infrastructure
Post-Bid
Conroe, TX 77303

Sanitary Sewer Force Main Project
Infrastructure
Post-Bid
Junction, TX

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Upland Waterline Relocation
Infrastructure
Post-Bid
$180,000 est. value
Lubbock, TX 79405

Elgin FM 1704 Wastewater Extension
Results
$2,000,000 est. value
Elgin, TX 78621

Proposed Utility Extensions Serving Harper's Preserve at State Highway 242
Infrastructure
Post-Bid
Conroe, TX 77306

20" Waterline Relocation for the Eleanor Street FMA Grant Project
Results
Less than $127,746 est. value
Beaumont, TX 77720

Water, Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Cedar Creek Lane
Results
TX

2021 Annual Water Distribution Leak Repairs, Package 4 Project
Term Contract
Results
Less than $1,605,302 est. value
San Antonio, TX 78200

Construction of Water Sanitary Drainage and Paving Facilities in Ladera Creek Trace Street Dedication Phase 2
Results
$459,100 est. value
TX

Construction of the Water, Sanitary Sewer, and Drainage Facilities to Serve Stewart Heights Section Seventeen
Results
TX

EMCSUD - CR 6710 from FM 471 to CR 5716
Results
$1,350,000 est. value
Devine, TX

Water Distribution, Sanitary Sewer and Drainage Facilities Barton Creek Ranch Section 5
Results
TX

Water Meter, Reclaimed
Results
Less than $988 est. value
San Antonio, TX

Last Updated 01/11/2022 07:36 AM
Project Title

24 Treated Transmission Waterline Project - Phase 3

Physical Address View project details and contacts
City, State (County) Portland, TX   (San Patricio County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, All Bids Received, Selection Underway
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all labor, materials, equipment, supervision and performing all Work required for the following Project: 24 Treated Transmission Waterline Project Phase 3 The project consists of the construction of approximately 28,250 LF of 24 C900-16 PVC waterline, associated road and railroad bores and various waterline appurtenances.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents