Similar Projects
Install New Beacon Tower and Beacon
Infrastructure
Bidding
$200,000 CJ est. value
Stuttgart, AR 72160

XNA Concourse A Gate Adjustment
New Construction
Post-Bid
Bentonville, AR 72712

New Airport Terminal
New Construction
Post-Bid
Arkadelphia, AR

Expand Terminal Building - Northwest Arkansas Regional
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$4,780,000 CJ est. value
Bentonville, AR 72712

Texarkana Regional Airport - Phase 3
New Construction - 40,510 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value

Repairs to the RMTC Airfield - Phase 1
Renovation
Post-Bid
$3,000,000 est. value
North Little Rock, AR

Hampton International Airport New 4 Story 90 Room
New Construction, Infrastructure
Post-Bid
$900,000 CJ est. value
Little Rock, AR 72201

Boone County Regional Airport - Harrison
New Construction, Infrastructure
Post-Bid
$1,090,000 CJ est. value
Harrison, AR 72601

Construction - FYV Fuel Farm Rehabilitation
Infrastructure
Post-Bid
$100,000 CJ est. value
Fayetteville, AR 72701

Runway 4-22 Rehabilitation - Phase 1 (Lighting)
Infrastructure
Post-Bid
$850,000 CJ est. value
El Dorado, AR 71730

Texarkana Regional Airport Phase 4
Renovation, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Texarkana, AR 71854

Lit Vortac Relocation and Dopplerization
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Little Rock, AR 72201

Construct 6,000 Gallon Avgas Service System
Infrastructure
Post-Bid
$150,000 CJ est. value
Calico Rock, AR 72519

XNA Terminal Building Expansion and Improvements
Addition, Demolition, New Construction, Infrastructure, Renovation - 91,525 SF
Post-Bid
$27,000,000 CJ est. value
Bentonville, AR 72712

Maintenance Facility
New Construction, Infrastructure
Post-Bid
$100,000 CJ est. value
Roe, AR 72134

Last Updated 03/08/2023 11:20 AM
Project Title

Terminal Building Envelope Stabilization

Physical Address View project details and contacts
City, State (County) El Dorado, AR 71730   (Union County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $120,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

For various building envelope stabilization work at the South Arkansas Regional Airport Terminal Building, El Dorado, Arkansas. A certified Bid Tabulation will be produced and distributed as quickly as is practical following the bid opening. A five percent (5%) corporate Bid Bond or a certified check in the amount of five percent (5%) of the bid shall accompany all submitted bids on construction contracts that exceed $20,000.00 in accordance with ACA 22-9-203. Bidders must comply with all requirements of Contractors Licensing Laws of the State of Arkansas, Act 150 of 1965, as amended, and Arkansas Code 22-9-204 section 3.6(a). A Performance and Payment Bond, equal to the amount of the contract, and issued by a surety approved by the Owner and authorized to do business in the State of Arkansas will be required of the successful bidder. Pursuant to Ark. Code Ann. 22-9-203, the Owner encourages all small, minority, and women business enterprises to submit bids for capital improvements. Encouragement is also made to all general contractors that in the event they subcontract portions of their work, consideration is given to the identified groups. The Owner reserves the right to reject any or all bids and to waive formalities. Proposals which fail to comply fully with any provision of the Plans, Specifications and other Contract Documents will be considered invalid and will not receive consideration. Contract Documents may be examined at the Office of the Architect.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents