Similar Projects
Norarrow Multifamily Housing
New Construction, Infrastructure - 270,880 SF
Conception
$80,000,000 CJ est. value
Fort Wayne, IN 46845

Murphy #6931 / Ft. Wayne
Demolition, New Construction, Infrastructure - 2,800 SF
Conception
$1,500,000 CJ est. value
Fort Wayne, IN 46802

Tiburon/Livingston Lakes Extended
New Construction, Infrastructure
Design
Fort Wayne, IN 46818

Hunters Development
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fort Wayne, IN 46845

Foster Park Relief Sewer - Indian Village CSO 05 Connection
Infrastructure
Bidding
$300,000 CJ est. value
Fort Wayne, IN 46807

2023 ROW Miscellaneous Package C
Infrastructure
Bidding
$180,000 CJ est. value
Fort Wayne, IN 46802

2022 Resurfacing Package Southeast
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Fort Wayne, IN 46802

Furnish and Install Traffic PaveĀ­ment Markings on Various Roads in Allen County
Infrastructure
Post-Bid
Fort Wayne, IN 46802

WWTP Improvements - Disk Filter Replacement
Renovation
Results
Berne, IN

FWCS 2022 Site and Traffic PPI
Infrastructure
Results
Fort Wayne, IN

Scooter's Coffee / Decatur
New Construction, Infrastructure - 664 SF
Construction
$200,000 CJ est. value
Decatur, IN 46733

RFP Construction Manager - East Terminal Expansion and Renovation
Addition, Demolition, Renovation, Infrastructure
Construction
$7,000,000 CJ est. value
Fort Wayne, IN 46809

North River Development
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
Fort Wayne, IN 46802

Cedar Creek Parks Trail
Infrastructure
Pending Verification
$6,600,000 CJ est. value
Leo, IN 46765

ExUrban
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Fort Wayne, IN 46802

Last Updated 09/27/2023 09:20 AM
Project Title

Biosolids Dewatering Improvements

Physical Address View project details and contacts
City, State (County) Monticello, IN 47960   (White County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $1,397,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 27, 2023, this project has not yet been awarded. A timeline for award has not yet been established. The Work includes the installation of a new biosolids dewatering system, including centrifuge, feed pumps, grinder, polymer system; piping and valves; electrical; instrumentation and controls; coatings; and related work necessary for a complete installation, all in accordance with the Contract Documents. Work shall be constructed under a Lump Sum Contract. Bids shall be properly and completely executed on a State Board of Accounts Form 96 (Revised 2013). Each Bid shall be accompanied by the Contractor's Bid Attachment (included with the Contract Specifications) to Form 96, a Financial Statement (completely filled out and signed) and a bid security in the form of an acceptable certified check payable to the Owner or an acceptable Bidder's bond, in an amount of not less than 5% of the total bid price, in accordance with the Contract Specifications. The Contract will be awarded in accordance with the provisions of IC 5-16-13 for Public Works projects awarded after June 30, 2015. Pursuant to IC 5-16-13-7, the provisions of the law are incorporated by reference. The construction of the project is expected to be funded in part by a State Revolving Fund (SRF) Loan as administered by the Indiana Finance Authority. The Contractor to whom the Work is awarded shall comply with all requirements of said agency. In accordance with the Davis-Bacon requirements, all contractor and subcontractors are required to pay not less than the Federal prevailing wage rates published by the U.S. Department of Labor for each classification of Work performed on this project. Bidders are notified that there is a 7% MBE and 5% WBE participation goal on this project. A conditional or qualified bid will not be accepted. Award will be made to the low, responsive, responsible bidder and must be approved by the State Revolving Fund Loan as administered by the Indiana Finance Authority. For contracts over $300,000.00, in accordance with IC 5-16-13-10 and IC 8-23-10-0.5, Contractor must be qualified under either IC 4-13.6-4 or IC 8-23-10 (Indiana Department of Administration or Indiana Department of Transportation) before doing any Work on a Public Works project. In accordance with IC 22-5-1.7-11.1, Contractors entering into a contract with the Owner, and contractors of any tier as defined in IC 5-16-13-4, will be required to enroll in and verify the work eligibility status of all newly hired employees through the E-Verify program (effective July 1, 2011), and comply with the reporting requirements of IC 5-16-13-11. In accordance with IC 5-16-13-11, Contractor shall submit an Employee Drug Testing Plan with their Bid and contractors of any tier as defined in IC 5-16-13-4 must comply with the drug testing requirements set forth in IC 4-13-18. Contractors shall complete a Drug Testing Plan Certification to be submitted with their Bid. The Owner reserves the right to waive any informalities or minor defects in bids or bidding procedure, or reject any and all bids, or to accept the bid from the lowest most responsible and responsive bidder as exclusively determined by the Owner. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. No Bidder may withdraw a bid within 60 days after the actual date of the opening thereof. Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the Owner and the Bidder determined by the Owner to be the lowest most responsible and responsive. Submission of a signed Bid by the Bidder constitutes acknowledgment of and acceptance of all the documents and terms and conditions of the Contractual-Legal Requirements and Technical Sections of the specifications in the Project Manual. The Contractor to whom the Work is awarded will be required to furnish an acceptable Performance and Payment Bond each in the amount of 100% of the contract price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the date of substantial completion. The Contractor to whom the Work is awarded will be required to purchase and maintain insurance coverage as described in the Contract Documents on an "occurrence basis". Reference drawings including Record Drawings from previous WWTP Improvements projects that were used by the Engineer in preparation of the Contract Documents may be examined during regular business hours at the Engineer, Wessler Engineering, 6219 South East Street, Indianapolis, Indiana 46227, Telephone (317) 788-4551.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents