Similar Projects
Asphalt and Sidewalk Rehabilitation
Infrastructure
Bidding

Flexible Delineator Post
Term Contract
Post-Bid

Phase I of Replacement and Installation of Sidewalks
Post-Bid
Pahokee, FL

Broadway and Blue Heron Block Redevelopment Project
Results
Riviera Beach, FL 33404

Broadway and Blue Heron Block Redevelopment Project
Results
Riviera Beach, FL 33404

Amazon Delivery Station
Build-Out, Infrastructure - 120,282 SF
Pending Verification
Riviera Beach, FL 33404

Asphalt Sidewalk and Driveway
Post-Bid
West Palm Beach, FL

Seminole Avenue and Lake Trail Improvements
Results
Less than $130,000 est. value
West Palm Beach, FL 33401

Gateway Boulevard and Military Trail Intersection Improvements
Post-Bid
$1,360,000 est. value
West Palm Beach, FL 33472

Asset Maintenance Services State Road 9 (I-95) Corridor throughout Palm Beach County
Term Contract
Results
Less than $40,606,300 est. value
FL

Libraries Digital Signage
Alteration
Post-Bid

Commons Parking Lot Expansion
Results
Less than $520,000 est. value
Royal Palm Beach, FL 33411

Signing - Pavement Markings - Palm Beach County Pavement Marking and Signing
Infrastructure
Post-Bid
$1,600,000 est. value
FL

Mid-Western Service Center-Parking Lot Repair and Restriping
Term Contract
Results
Less than $100,000 est. value
Royal Palm Beach, FL 33411

Dillman Trail Project
Infrastructure
Post-Bid
$623,356 est. value
Greenacres, FL

Reported 01/28/2022 12:00 AM
Project Title

Installation of an ADA Compliant Aluminum Railing and Retention Wall at the North Access of Lantana Beach

Physical Address View project details and contacts
City, State (County) Lantana, FL   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $120,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor, equipment, materials, and perform all operations for applicable construction. Remove, dispose of, and replace approximately 290 LF of wood railing with a new aluminum tubular railing system, including hardware, at the north side of the beach main entrance and south ADA ramp. The new tubular railing must meet ADA compliance on those locations. Texture, color, and design must match the railing installed at the south access of Lantana Beach. Installation of 2’ X 6” X 1’ (65 LF) of Retaining Wall Footing. Removal of 50 x 5 Pavers and Installation of 50 x 5 sidewalk with a broom finished.

Details

Division 06 - Wood, Plastics, and Composites, Wood Stairs and Railings, Wood Railings.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents