Last Updated | 12/09/2022 06:33 AM |
Project Title | Lake Vermilion State Recreation Area Trailside Campground ATV Bridge |
Physical Address | View project details and contacts |
City, State (County) | Tower, MN 55790 (Saint Louis County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $927,200 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference and has a 3% (TG/ED/VO) subcontracting goal established. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. A. The work will be done under one prime contract that includes: General Construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Install H-Piling for concrete substructure (approx. 335 LF including two test piles) 2. Construct two reinforced concrete abutments (approx. 75 CY's concrete) 3. Construct ATV trail embankment (Approx. 2,550 CY's Embankment Material) 4. Raise Road elevation and construct proposed intersection 5. Install surfacing aggregate (Approx. 950 CY's) 6. Furnish and install 150' long weathering steel truss bridge with concrete deck 7. All associated erosion control, traffic control, utility coordination, and site stabilization. Plans and Specifications were prepared by the Minnesota Department of Natural Resources, Contact: Danny Anderson, email: danny.anderson@state.mn.us, Telephone: (218) 407-7052. Est. Completion Date: July 26, 2024 This project has a 3% Targeted Group (TG), Economically Disadvantaged (ED), and Veteran-Owned (VO) Small Business (TG/ED/VO) subcontracting goals established. All questions should be submitted no later than 12/02/2022. The State is not obligated to answer questions submitted after the question due date and time |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |