Similar Projects
Palmera Bluff Section 1 Street Drainage and Utility Improvements
Post-Bid
Round Rock, TX 78664

Palmera Ridge Section 9 - Street - Drainage - Utility Improvements
Post-Bid
Round Rock, TX 78664

Santa Rita Ranch South Section 7B Street Excavation and Drainage - Water - Wastewater - Erosion Control Improvements
Results
Liberty Hill, TX 78642

Santa Rita Ranch South Section 5B Street Excavation and Drainage - Water - Wastewater - Erosion Control Improvements
Results
Liberty Hill, TX 78642

San Gabriel Parkway Phase 1 - Street - Drainage & Utility Improvements
Post-Bid
Leander, TX 78641

Saddlecreek Phase 12 - Water - Wastewater - Drainage Improvements
Results
Georgetown, TX 78759

Siena Section 31 Street Excavation and Drainage, Water, Wastewater, and Erosion Control Improvements
Post-Bid
Round Rock, TX 78664

Construction of Kasper Sections 8 and 9 Water, Wastewater and Drainage Improvements
Results
TX

Santa Rita Ranch South Section 7C - Street Excavation and Drainage, Water, Wastewater, and Erosion Control Improvements
Post-Bid
Liberty Hill, TX

Gattis School Road Wastewater Improvements
Results
Round Rock, TX

Corrugated Metal Pipe
Term Contract
Post-Bid
Georgetown, TX

Bryson Phase 2, Section 2, Public Improvement Construction Plans
Results
Leander, TX 78641

Construction of Santa Rita Ranch West Phase 1 Section 2 - Street Excavation and Drainage, Water, Wastewater, and Erosion Control Improvements
Post-Bid
Round Rock, TX 78664

Lost River Road Cross Culvert Replacement
Results
$161,000 est. value
TX

Park at Blackhawk IV Phase 3 - Street Excavation and Drainage, Water, Wastewater, and Erosion Control Improvements
Post-Bid
Round Rock, TX

Reported 11/30/2018 12:00 AM
Project Title

Star Ranch Section 7 Phase 7 - Street Excavation and Drainage, Water, Wastewater, and Erosion Control Improvements

Physical Address View project details and contacts
City, State (County) Round Rock, TX 78664   (Williamson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description The bid is for all the improvements for the project, which includes erosion controls and all labor, equipment, and other necessary appurtenances to construct the project.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Electrical Utilities, Communications Utilities.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents