Similar Projects
Maclean Hall Major Renovation
Renovation - 79,634 SF
Conception
$27,900,000 est. value
Iowa City, IA 52240

New Womens Gymnastics Spirit Squad Training Center
New Construction - 30,000 SF
Conception
$7,000,000 to $9,000,000 est. value
Iowa City, IA

Iowa Wrestling Training Facility
New Construction - 37,000 SF
Bidding
$17,200,000 est. value
Iowa City, IA 52242

Iowa Memorial Union - Install Show Dorm Room
Renovation
Bidding
$110,000 est. value
Iowa City, IA 52245

HCC Brock Student Center Bookstore
Post-Bid
Waterloo, IA 50701

Hillcrest Residence Hall - Renovate Student Living Space
Renovation
Post-Bid
Iowa City, IA

Kirkwood Animal Health Building
New Construction
Results
Cedar Rapids, IA

Straka Johnson #20017 `Calmar Plant Services - Phase One`
Demolition, Infrastructure
Results
$230,000 to $250,000 est. value
Calmar, IA

Grundy Hall
Renovation, Addition - 78,000 SF
Construction
Waterloo, IA 50701

West Des Moines Campus
New Construction - 320,000 SF
Construction
$50,000,000 est. value
Des Moines, IA 50312

Gallagher Bluedorn Expansion
Renovation, Addition - 20,900 SF
Pending Verification
Cedar Falls, IA 50614

UIHC - Pomerantz Family Pavilion - Expand Cancer Center Centralized Intake
Renovation
Bidding
$1,100,000 est. value
Iowa City, IA 52242

UIHC - Iowa River Landing - Upgrade Rooms 1400 and 1503 USP 800
Renovation
Post-Bid
Coralville, IA

Clinton - Career and Technical Education Building
Renovation
Results
Clinton, Muscatine, IA 52732

Hawkeye Community College at Techworks - Smart Automation Certification Alliance (SACA) Center
Renovation
Bidding
$5,120,000 est. value
Waterloo, IA 50701

Last Updated 05/19/2022 06:59 AM
Project Title

Hospital Parking Ramp No.3 - Renovate Elevator Bank and Control Room

Physical Address View project details and contacts
City, State (County) Iowa City, IA 52242   (Johnson County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,190,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of modernization of the elevators XELA1 and XELA2, including cab finishes and painting of the hoistway and cab exterior, and mechanical and electrical code upgrades in the hoistway and machine room as required.

Details

Division 01 - General Requirements, Temporary Construction, Temporary Ramps.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents