Similar Projects
Interstate 81 over West Foothills Drive
Infrastructure
Conception
$6,958,544 CJ est. value
Drums, PA 18222

Interstate 81 over West Foothills Drive
Infrastructure
Conception
$6,958,544 CJ est. value
Drums, PA 18222

SR 1012 over Tributary Harvey's Creek
Demolition, New Construction, Infrastructure, Renovation
Design
$750,000 CJ est. value
Jackson Township, PA 18708

SR 1012 over Tributary Harvey's Creek
Demolition, New Construction, Infrastructure, Renovation
Design
$750,000 CJ est. value
Jackson Township, PA 18708

Mifflin Avenue Outfall Stabilization
Infrastructure
Bidding
$140,000 CJ est. value
Nescopeck, PA 18635

South Main Street Streetscape Improvements
Infrastructure
Post-Bid
Ashley, PA 18706

Maplewood Paving Project
Infrastructure
Post-Bid
Mountain Top, PA

Oakwood Drive Improvement Project
Results
$117,659 est. value
Laflin, PA 18702

Superpave
Infrastructure
Results
Sugarloaf, PA

New Jersey Central Railroad Train Station Improvement
Renovation - 32,000 SF
Construction
$1,200,000 est. value
Wilkes-Barre, PA 18704

7-Eleven - Site Improvements & Fueling Systems
New Construction
Construction
$1,000,000 to $5,000,000 CJ est. value
Hazle Township, PA 18202

SR 315 over Reading Blue Mt and Northern Railroad
Infrastructure, Renovation
Conception
$2,950,000 CJ est. value
Pittston, PA 18640

I-81 NB Grinding Luzerne
Infrastructure
Design
$205,800,000 CJ est. value
Mountain Top, PA 18707

Site and Utility Relocation Work in Allen Street
Infrastructure
Post-Bid
Hazleton, PA 18201

Wesley Road Bridge
Infrastructure
Results
PA

Last Updated 01/09/2023 02:10 AM
Project Title

I-80 EB over I-81 NB/SB

Physical Address View project details and contacts
City, State (County) Butler Township, PA 18222   (Luzerne County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $15,250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Luzerne County, Butler Township, Interstate 80. Primary Improvement Type: Bridge Improvement As of January 09, 2023, the project is In development stage. Anticipated letting date is January 23, 2025. PennDOT - I-80 EB over I-81 NB/SB *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents