Similar Projects
Creighton Court Community Center Chiller Replacement
Alteration
Bidding
Richmond, VA 23223

Replacement/Refurbishment Datacenter AHU #1 and #3
Post-Bid
Radford, VA 24143

HVAC Services - DMV Emporia CSC
Post-Bid
Charlottesville, VA

HVAC Repair and Maintenance Services for Various Town Facilities
Results
Purcellville, VA 20132

Modern Green High-Efficiency HVAC System
Results
Richmond, VA

HVAC Upgrade 1103-02F
Post-Bid
Dahlgren, VA

Chiller Maintenance Services
Results
Dahlgren, VA 22448

HVAC and Mechanical Products
Term Contract
Post-Bid

Liberty Middle School - HVAC and Ceiling Replace
Results
Ashland, VA 23005

Air Purifier with Hepa Filter
Post-Bid
Richmond, VA

Fredericksburg District HVAC Services
Term Contract
Results

HVAC Services
Term Contract
Post-Bid

HVAC Services Culpeper District
Term Contract
Results

Repair HVAC and Fire Alarm System at Facility 661
Post-Bid
$1,000,000 to $5,000,000 est. value
Hampton, VA 23665

Install A/C in Kitchens at Various Schools
Results
Stafford, VA 22554

Reported 08/26/2021 12:00 AM
Project Title

Repair Water Heater System With Passive Solar Hot Water Heat Shellbank Gym F. 226 Project Muhj16-4070

Physical Address View project details and contacts
City, State (County) Hampton, VA 23665   (Hampton City County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The gymnasium is comprised of a basketball arena, extensive weight and aerobic training facilities, half-olympic size pool, indoor track, and 50 individual showers. Approximately 400 to 750 showers are taken daily. The current 15-year old natural gas fired hot water heating system is comprised of two oversized boilers. One boiler supports the changing room showers, clothes washing, and building heating during moderate spring and autumn temperatures. Originally, the second boiler only supported the heating of the swimming pool. Heating of the swimming pool is conducted approximately once a week. The current boilers are alternated during the summer months to extend their useful life. Both boilers are operated in December and January when colder temperatures and increased gymnasium use requires the use of both boilers. The proposed solar hot water heating system is intended to supplement the existing hot water boilers which will be retained.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents