Similar Projects
Safety Improvements - SC 81
Infrastructure
Bidding
SC

Construct a Trail Head and a Section of the Swamp Rabbit Trail along a .25 Easement
Post-Bid
Mauldin, SC 29662

Brake Lane and Slope Hill
Infrastructure
Post-Bid
Greenville, SC

Greenville Legislative Transportaion Committee MMRP FY20-21 - GlDTC 574.03
Results
$6,500,000 to $7,500,000 est. value
Greenville, SC 29601

Greenville Legislative Delegation Transportation Committee MMRP FY 20-21 - 574.02
Results
$4,500,000 to $5,700,000 est. value
Greenville, SC 29601

Travelers Rest Downtown Overlay
Infrastructure
Post-Bid
Travelers Rest, SC

Repaving Asphalt
Results
Mauldin, SC 29662

Augusta Street Streetscape Phase 1 - Road Diet Restriping
Infrastructure
Post-Bid
Greenville, SC 29613

Fairmont Avenue Improvements
Results
Greenville, SC 29605

Municipal Match Resurfacing Program and GLDTC 596 Resurfacing
Infrastructure
Post-Bid
$9,000,000 to $11,000,000 est. value
Greenville, SC

Reconstruction/Rehabilitation - Greenville Co
Results
SC

Municipal Match Resurfacing Program FY 20/21 (Municipalities)
Results
$4,000,000 to $5,000,000 est. value
Greenville, SC

Safety Improvements at S-279
Results
SC

Safety Improvement at S-279
Infrastructure
Results
SC

GA Development Area-Phase 1A Paving
Alteration
Results
Greer, SC

Reported 03/21/2022 09:00 AM
Project Title

Taylors Elementary - Car Loop Expansion

Physical Address View project details and contacts
City, State (County) Taylors, SC 29687   (Greenville County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction approximately 1,300 LF of a two-lane driveway expansion loop and widening approximately 600 LF of the existing driveway, creating a 2-lane exit. The project site location is 805 Reid School Road, Taylors, South Carolina and is next to Taylors Elementary School. The District purchased the wooded lot at 805 Reid School Road, Taylors to provide the capacity for this project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents