Similar Projects
Daytona Beach Courthouse Annex Ramp Renovation
Infrastructure
Bidding
$175,000 est. value
Daytona Beach, FL 32114

Snook Park - Parking and Boardwalk Improvements
Infrastructure
Bidding
$206,060 est. value
Deltona, FL 32738

Daytona Campus - Parking Lots A, B and C
Post-Bid
Daytona Beach, FL 32114

As Needed New Sidewalk Installation and Repairs
Term Contract
Post-Bid
Deltona, FL

Fleming Avenue ADA Sidewalk
Results
Less than $70,500 est. value
De Land, FL 32720

Orange City Votran Parking Lot
Results
Less than $715,000 est. value
Orange City, FL 32763

Beechdale Park - Parking and Boardwalk Improvements (Phase II)
Infrastructure
Bidding
$229,610 est. value
Deltona, FL 32725

Spring to Spring Trail, 3B, Rob Sullivan Park to Dirksen
Results
Less than $2,575,000 est. value
DeBary, FL 32713

ADA and Visitor Parking and Ramp for VIA Hall
Infrastructure
Bidding
Oak Hill, FL 32759

Lime Tree Drive ADA Sidewalk Project
Results
Less than $155,000 est. value
Edgewater, FL 32132

Construct Concrete ADA Parking Spaces
Infrastructure
Bidding
Oak Hill, FL 32759

Derbyshire Neighborhood Sidewalks Phase 1 - Third Street and Vine Street
Results
$589,000 to $763,000 est. value
Daytona Beach, FL 32100

Allen Green Center Parking Lot Sealcoating
Results
Port Orange, FL

Blue Spring State Park - ADA Boardwalk Replacement
Results
Less than $156,372 est. value
Orange City, FL 32763

Daytona Beach International Airport Parking Lot Improvements
Results
Less than $2,907,229 est. value
Daytona Beach, FL 32114

Last Updated 10/22/2021 04:59 PM
Project Title

Cherrywood Drive and Division Avenue Sidewalk Repair

Physical Address View project details and contacts
City, State (County) Ormond Beach, FL 32174   (Volusia County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The 10’ wide sidewalk between Cherrywood Drive and Division Avenue has suffered multiple fractures and cracks that have become hazardous to pedestrians. The sidewalk has limited access and is obstructed to large vehicles by bollards. There are approximately 21 panels of the sidewalk that need to be replaced to mitigate the hazards. This comes to approximately 250 SY of replacement concrete. The existing sidewalk is 4” concrete. We are proposing 6”, 4000 PSI concrete for the replacement so that leisure services and maintenance vehicles can drive on the pavement.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents