Similar Projects
Last Updated | 10/22/2021 04:59 PM |
Project Title | Cherrywood Drive and Division Avenue Sidewalk Repair |
Physical Address | View project details and contacts |
City, State (County) | Ormond Beach, FL 32174 (Volusia County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The 10’ wide sidewalk between Cherrywood Drive and Division Avenue has suffered multiple fractures and cracks that have become hazardous to pedestrians. The sidewalk has limited access and is obstructed to large vehicles by bollards. There are approximately 21 panels of the sidewalk that need to be replaced to mitigate the hazards. This comes to approximately 250 SY of replacement concrete. The existing sidewalk is 4” concrete. We are proposing 6”, 4000 PSI concrete for the replacement so that leisure services and maintenance vehicles can drive on the pavement. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |