Similar Projects
Westside WWTP Sludge Dewatering Equipment
Alteration
Bidding
High Point, NC

Wastewater Transmission System Improvements - Contract 1
New Construction
Bidding
Pittsboro, NC 27312

Water Reclamation Facility Expansion Project Clarifiers Work
Renovation
Sub-Bidding
Clayton, NC 27520

Residuals Management - Wastewater Treatment Division
Post-Bid
Gastonia, NC 28052

WWTP Improvements Contract I
Post-Bid
Mount Olive, NC 28365

Wastewater Treatment Plant Improvements - Filter Replacement
Results
$1,200,000 est. value
Hendersonville, NC

Northeast Brunswick Regional Wastewater Treatment Plant 2.5 MGD Expansion
Results
Leland, NC

Muddy Creek Minor Plant Improvements Phase 1
Renovation
Bidding
Winston-Salem, NC 27127

Triangle Wastewater Treatment Plant Emergency and Scheduled Treatment Plant Repairs
Post-Bid
Durham, NC

Sugar Creek WWTP Maintenance Building
Results
Charlotte, NC 28210

Mcalpine WAS Equalization Improvements
New Construction
Bidding
Pineville, NC 28134

Elizabeth City Raw Water Reservoir and WTP Upgrades
Renovation
Post-Bid
Less than $1,300,000 est. value
Elizabeth City, NC 27906

Big Buffalo Water Reclamation Facility Flood Rehabilitation Project
Results
Less than $4,500,000 est. value
Sanford, NC 27330

Mason Farm WWTP Fermenter Mixing Improvements
Renovation
Bidding
Chapel Hill, NC

Mallard Creek WRF Phase 1 Improvements Construction Manager at Risk Services
Post-Bid
$89,200,000 est. value
Charlotte, NC

Last Updated 10/13/2021 11:41 AM
Project Title

210 Wastewater Treatment Facility

Physical Address View project details and contacts
City, State (County) Smithfield, NC 27577   (Johnston County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $50,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of the following: 1. New preliminary treatment facility 2. New preliminary effluent distribution box 3. New BNR basins with fine bubble diffusers, mixers, nitrified recycle pumps, waste activated sludge pumps, and process drain pumps 4. New blower building 5. New secondary clarifiers 6. New recycle activated sludge pump station 7. New chemical storage and feed facility 8. New drain pump station 9. New disk filters 10. New ultraviolet disinfection facility (add alternate) 11. New sodium hypochlorite facility 12. New effluent pump station 13. New cascade aerator 14. New maintenance building 15. New administration building

Details

Sewage Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents