Similar Projects
Aluminum Standing Seam Roof Systems for Township Line Road Station
Bidding
Less than $25,000 est. value
Philadelphia, PA

York and Dauphin Station Tarps
Post-Bid
Philadelphia, PA

Roof Replacements at Three Sites in NJ & PA
Renovation
Post-Bid

Trainshed Exterior Masonry Renovations
Results
Philadelphia, PA 19107

Thomas Creighton Elementary School Roof Replacement- General
Results
Less than $1,154,176 est. value
Philadelphia, PA 19120

Cleaner - CCTF - Graffiti Remover
Post-Bid
Philadelphia, PA

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Roofing Envelope Services
Post-Bid

15th Street Sales Office Storefront
Results
Less than $25,000 est. value
Philadelphia, PA

Roofing Related Services
Post-Bid
Philadelphia, PA 19121

Roof Membrane
Results
Less than $25,000 est. value
Philadelphia, PA 19107

Roofing MACC
Post-Bid

Edwin Forrest Elementary School Roof Replacement- General
Results
Less than $364,292 est. value
Philadelphia, PA 19136

Request for Quotation - Materials Wheeling & Lake Erie Railway
Renovation
Post-Bid

Roof Replacement Services - Mount Olivet
Results
Philadelphia, PA

Last Updated 10/28/2020 10:20 AM
Project Title

Salt Storage Fabric Wall Replacement in the 2nd HD, Salt Storage Roof Replacement in the 4th HD, and Salt Brine Mixer Structure Removal and Replacement in the 6th HD

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19102   (Philadelphia County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior, Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This projects scope is for work for three (3) existing fabric covered structures in the Highway District yard locations. 1. The salt storage structure in the 2nd Highway District requires removal and replacement of the fabric wall at the front of the structure, along with some repair of the garage door and structural frame elements along the front wall; and installation of a pre-cast concrete brick foundation for the replaced fabric wall. 2. The salt storage structure in the 4th Highway District requires removal and replacement of the entire fabric roof system. 3. The Salt Brine Mixer structure in the 6th Highway District requires disconnecting of all utilities, safe removal of the existing fabric structure, and replacement of a new fabric structure at the same location, to be set on a new pre-cast concrete block foundation. Participation Ranges: MBE: 10% - 15%. WBE: 5% - 10%

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents