Similar Projects
Norarrow Multifamily Housing
New Construction, Infrastructure - 270,880 SF
Conception
$80,000,000 CJ est. value
Fort Wayne, IN 46845

Norarrow Multifamily Housing
New Construction, Infrastructure - 270,880 SF
Conception
$80,000,000 CJ est. value
Fort Wayne, IN 46845

Tiburon/Livingston Lakes Extended
New Construction, Infrastructure
Design
Fort Wayne, IN 46818

Hunters Development
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fort Wayne, IN 46845

2022 Resurfacing Package Southeast
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Fort Wayne, IN 46802

2022 Resurfacing Package Southeast
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Fort Wayne, IN 46802

Concrete Pavement Restoration and Replace Superstructure
Infrastructure
Results
IN

FWCS 2022 Site and Traffic PPI
Infrastructure
Results
Fort Wayne, IN

RFP Construction Manager - East Terminal Expansion and Renovation
Addition, Demolition, Renovation, Infrastructure
Construction
$7,000,000 CJ est. value
Fort Wayne, IN 46809

Isabelle Gardens
New Construction, Infrastructure
Construction
$5,000,000 CJ est. value
Fort Wayne, IN 46805

RFP Design Architectural and Engineering Services for the Expansion and Renovation of Levan R. Scott Academy
Addition, Renovation, Infrastructure
Pending Verification
$670,000 CJ est. value
Fort Wayne, IN 46806

North River Development
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
Fort Wayne, IN 46802

Shift or Reconfigure Existing Taxiway - Fort Wayne Allen County Airport Authority
Infrastructure
Conception
$895,148 est. value
Fort Wayne, IN 46825

Premier Riverfront Property
New Construction, Infrastructure - 60,000 SF
Design
$70,000,000 CJ est. value
Fort Wayne, IN 46802

Echo Synergy RFP
New Construction, Infrastructure
Post-Bid
Fort Wayne, IN 46825

Last Updated 09/12/2023 03:43 PM
Project Title

Alley R00253 East/West - Prospect Ave, Wagner St, North Monroe St, Spy Run Ave

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46802   (Allen County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Improve the east-west alley bounded by Prospect Ave, Wagner St, N Monroe St, and Spy Run Ave by removing and replacing the existing deteriorated concrete pavement. The Board reserves the right to reject any and all bids EBE GOALS - The City's goal for qualified Emerging Business Enterprise (E.B.E), as subcontractors on this project is ten percent (10%) of the contract amount. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Robert Widner may be reached by telephone at (260) 427-1217 or through email at bob.widner@cityoffortwayne.org.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents