Similar Projects
Ringling College of Art & Design - Dining Facility
New Construction - 30,000 SF
Conception
$11,000,000 est. value
Sarasota, FL 34234

Rasmussen College
Renovation - 44,000 SF
Conception
Odessa, FL

USF Wellness Center Complex Phase 1
Design
Less than $20,000,000 est. value
Tampa, FL

Hobe Sound Bible College Gymnasium
Addition - 13,500 SF
Design
Hobe Sound, FL 33455

Gator Village aka Honors Residential College
New Construction
Bidding
$225,000,000 est. value
Gainesville, FL

FPU Applied Research Center Construction
New Construction - 85,100 SF
Sub-Bidding
$30,000,000 est. value
Lakeland, FL 33805

Miami Dade College North Campus Artificial Intelligence Center
Sub-Bidding
$2,950,000 to $3,185,000 est. value
Miami, FL 33132

FAMU Student Affairs Center for Access and Student Success
Post-Bid
Less than $26,000,000 est. value
Tallahassee, FL

Student Union Replacement
New Construction - 270,000 SF
Post-Bid
Less than $100,000,000 est. value
Tallahassee, FL

Construction Manager for the Renovation of Radio Station WQCS (Building Q) & Replacement of the Industrial Building (Building O)
Results
Fort Pierce, FL 34945

Roth Athletic Center (Wayne Densch Building 77 Expansion)
Build-Out - 40,000 SF
Results
$5,000,000 est. value
Orlando, FL

Hoffman Teaching Lab Renovations
- 79,500 SF
Construction
$7,500,000 to $10,000,000 est. value
Tallahassee, FL 32304

The Malachowsky Data Sciences and Information Technology
- 260,000 SF
Construction
Less than $135,000,000 est. value
Gainesville, FL

University Station Hollywood - Master Plan
New Construction, Build-Out - 11,000 SF
Conception
$40,336,400 est. value
Hollywood, FL 33020

Integrated Watershed and Coastal Studies (Academic Building 9)
New Construction - 117,000 SF
Design
$50,000 to $57,000,000 est. value
Fort Myers, FL 33965

Last Updated 11/19/2020 08:25 AM
Project Title

Florida Gateway College Building 17 Anatomy/Physiology Renovations

Physical Address View project details and contacts
City, State (County) Lake City, FL 32025   (Columbia County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Renovations to existing Building 17 for the Anatomy/Physiology Department as outlined in the Documents. The work includes, but is not limited to: cutting and patching, selective structure demolition, cast-in-place concrete, concrete finishing, metal fabrications, miscellaneous rough carpentry, architectural wood casework, blanket insulation, vapor retarders, joint protection, door schedule, hollow metal doors and frames, flush wood doors, aluminum-framed entrances and storefronts, door hardware, glazing, finish schedule, gypsum board assemblies, nonstructural metal framing, acoustical panel ceilings, resilient flooring accessories, resilient flooring, painting and coating and termite control. Mechanical, Plumbing and Electrical work, as outlined in the Documents.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents