Similar Projects
Water Station Electrical Improvements - Pump and Motor Replacement - All Stations
Infrastructure
Conception
$2,566,741 est. value
Schaumburg, IL

Southwest Waterworks Pump Station Rehabilitation
Infrastructure
Bidding
$280,000 est. value
Bolingbrook, IL 60490

Relief Well Testing and Inspection
Infrastructure
Bidding
Wood River, IL

East Stl Bp 12 Phase 1 Relief Wells
Post-Bid
$10,000,000 to $15,000,000 est. value
Madison, IL

Purchase of Valves and Actuators for Wells 10 and 16
Post-Bid
Crystal Lake, IL

Chemical Treatment of Deep Wells
Results
East Saint Louis, IL

Chemical Treatment of Deep Wells
Results
East Saint Louis, IL

Well No. 2 Construction Work
Infrastructure
Bidding
$740,000 est. value
Union, IL 60180

Alaris IV Pumps
Post-Bid
Chicago Heights, IL

New Water Treatment Plant for Well House No. 11
New Construction
Results
Freeport, IL

Well No. 9 Project
Infrastructure
Bidding
$100,000 est. value
Rantoul, IL

Procurement Services Office
Post-Bid
Naperville, IL

Well House No. 3 Improvement
Results
Pearl City, IL

Zone 1 - Statewide Leaking Well Plugging and Restoration Work
Infrastructure
Bidding
$90,000 est. value
Browns, IL

Well 6 Repairs
Post-Bid
Antioch, IL

Last Updated 06/27/2022 01:19 AM
Project Title

4 MG Standpipe Replacement Pumps and VFD Upgrades

Physical Address View project details and contacts
City, State (County) Woodridge, IL 60517   (DuPage County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $330,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes, but is not limited to: removing two (2) existing pumps, removing three (3) existing pump electrical starter sections from existing MCC, furnishing and installing two (2) new replacement pumps in the physical space of the existing pumps, furnishing and installing two (2) VFD pump starters with RVSS bypass starters in MCC space of existing pump starters, furnish and install pump flexible pipe connectors and pipe flange fillers to mate new replacement pumps with existing pump suction and discharge piping, new control conduits and conductors between new VFD starters and existing PLC in existing control panel, pressure testing, disinfection and startup of proposed improvements.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents