Similar Projects
Last Updated | 10/09/2023 02:31 AM |
Project Title | Booster Pump Station Skid and Controls at Highway 412 Water Tank for Water Distribution System Pressure Stabilization |
Physical Address | View project details and contacts |
City, State (County) | Cotter, AR 72626 (Baxter County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Storage/Water Tanks |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $400,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Owner reserves the right to waive any informality or to reject any or all bids Information for Bidders, Bid Forms, Form of Contract, Plans and Specifications, Bid Bond Form, Performance and Payment Bond Forms, and other Contract Documents may be examined at the following locations: Engineering Services, Inc., 1207 S. Old Missouri Road, Springdale, Arkansas 72765 Each bidder must deposit with his bid, security in the amount for and subject to the conditions provided in the Information for Bidders. No Bidder may withdraw his bid within sixty (60) days after the actual date of the opening thereof. Scope of Work Under this contract, the Contractor shall complete all water main replacement as shown on the plans and described herein including the furnishing of all labor, supplies, tools, equipment, materials, transportation, and any other items necessary for the work. All work shall be completed in accordance with the working drawings, General Specifications, and these Detailed Specifications. Quality of Plans and General Specifications The construction plans have been prepared with care but should not be expected to be correct in every detail. Therefore, the Owner or Engineer may make minor changes to facilitate construction, preserve existing features, reduce construction costs, etc. The General Specifications are general in nature and may sometimes refer to work and conditions not found on this project. In such cases, non-applicable stipulations will have no meaning. If there is a conflict between the General Specifications and Detailed Specifications, the Detailed Specifications shall govern. Conflicts in plans and specifications shall be brought to the attention of the Engineer. The Engineer shall determine which of the conflicting elements shall govern |
||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |