Similar Projects
Sayle Street Improvements (Kari Lane to Joe Ramsey Boulevard)
Infrastructure
Post-Bid
Less than $9,600,000 est. value
Greenville, TX 75402

2021 Annual Pavement/Utility Contract
Term Contract
Post-Bid
Greenville, TX

Southern Region Disaster Recovery Support BPA
Results

Industrial Drive Improvements
Results
$808,510 est. value
Greenville, TX 75401

Paving Improvements to Serve Trailstone Phase 4
Infrastructure
Post-Bid
Caddo Mills, TX 75135

2020 Street Improvement Program
Results
$1,541,146 est. value
Greenville, TX 75401

Paving Improvements to serve Magnolia, Phase 10
Infrastructure
Post-Bid
TX

Ed Rutherford Drive Street Improvement
Results
$1,813,853 est. value
Greenville, TX 75401

Roy Warren Parkway
Infrastructure
Post-Bid
Greenville, TX 75402

Stonewall Street Improvements
Results
$3,563,500 est. value
Greenville, TX 75401

On Call Pothole Repair
Results
Less than $115,200 est. value
TX

Verandah Phase 4 Paving Improvements
Results
Greenville, TX

Preventive Maintenance
Results
Less than $14,400,091 est. value
TX

Valor Farms Phase 2 Paving Improvements
Results
TX

Asphalt
Results
$247,200 est. value
TX

Last Updated 04/07/2022 02:36 AM
Project Title

SS 302 - Overlay

Physical Address View project details and contacts
City, State (County) TX   (Hunt County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,729,625
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

104 6022 Removing Conc (Curb and Gutter) Lf 250.000 1 105 6011 Removing Stab Base and Asph Pav (2"-6") Sy 13.000 2 132 6003 Embankment (Final)(Ord Comp)(Ty B) Cy 37.000 3 134 6001 Backfill (Ty a) Sta 39.310 4 162 6002 Block Sodding Sy 83.000 5 164 6009 Broadcast Seed (Temp) (Warm) Sy 4,819.000 6 164 6011 Broadcast Seed (Temp) (Cool) Sy 4,819.000 7 164 6015 Straw/hay Mlch Seed(Perm)(Rural)(Clay) Sy 9,637.000 8 168 6001 Vegetative Watering Mg 28.970 9 351 6006 Flexible Pavement Structure Repair(10") Sy 5,901.000 10 354 6022 Plane Asph Conc Pav(0" to 3") Sy 186,861.000 11 361 6052 Full - Depth Repair Crcp (8"-14") Sy 22.000 12 432 6045 Riprap (Mow Strip)(4 in) Cy 172.100 13 450 6018 Rail (Ty T631) Lf 75.000 14 500 6001 Mobilization Ls 1.000 15 502 6001 Barricades, Signs and Traffic Handling Mo 8.000 16 506 6040 Biodeg Erosn Cont Logs (Instl) (8") Lf 70.000 17 506 6043 Biodeg Erosn Cont Logs (Remove) Lf 70.000 18 529 6008 Conc Curb & Gutter (Ty Ii) Lf 250.000 19 531 6003 Conc Sidewalks (6") Sy 37.000 20 540 6002 Mtl W-beam Gd Fen (Steel Post) Lf 1,950.000 21 540 6006 Mtl Beam Gd Fen Trans (Thrie-beam) Ea 11.000 22 540 6014 Short Radius Lf 25.000 23 540 6015 Driveway Terminal Anchor Section Ea 5.000 24 540 6016 Downstream Anchor Terminal Section Ea 1.000 25 540 6037 Mtl Bm Gd Fen Trans (Anchor Plate) Ea 12.000 26 542 6001 Remove Metal Beam Guard Fence Lf 1,875.000 27 542 6003 Remove Downstream Anchor Terminal Ea 10.000 28 544 6001 Guardrail End Treatment (Install) Ea 18.000 29 544 6003 Guardrail End Treatment (Remove) Ea 9.000 30 644 6068 Relocate Sm Rd Sn Sup&am Ty 10bwg Ea 3.000 31 662 6001 Wk Zn Pav Mrk Non-remov (W)4"(Brk) Lf 4,387.000 32 662 6032 Wk Zn Pav Mrk Non-remov (Y)4"(Brk) Lf 6,130.000 33 662 6034 Wk Zn Pav Mrk Non-remov (Y)4"(Sld) Lf 42,709.000 34 662 6111 Wk Zn Pav Mrk Sht Term (Tab)ty Y-2 Ea 3,975.000 35 666 6035 Refl Pav Mrk Ty I (W)8"(Sld)(090mil) Lf 1,214.000 36 666 6041 Refl Pav Mrk Ty I (W)12"(Sld)(090mil) Lf 875.000 37 666 6047 Refl Pav Mrk Ty I (W)24"(Sld)(090mil) Lf 2,318.000 38 666 6053 Refl Pav Mrk Ty I (W)(Arrow)(090mil) Ea 35.000 39 666 6074 Refl Pav Mrk Ty I (W)(Number)(090mil) Ea 16.000 40 666 6092 Refl Pav Mrk Ty I (W)(Rr Xing)(090mil) Ea 5.000 41 666 6137 Refl Pav Mrk Ty I (Y)8"(Sld)(090mil) Lf 270.000 42 666 6140 Refl Pav Mrk Ty I (Y)12"(Sld)(090mil) Lf 275.000 43 666 6146 Refl Pav Mrk Ty I (Y)24"(Sld)(090mil) Lf 375.000 44 666 6167 Refl Pav Mrk Ty Ii (W) 4" (Brk) Lf 4,387.000 45 666 6302 Re Pm W/ret Req Ty I (W)4"(Sld)(090mil) Lf 58,994.000 46 666 6311 Re Pm W/ret Req Ty I (Y)4"(Brk)(090mil) Lf 6,130.000 47 666 6314 Re Pm W/ret Req Ty I (Y)4"(Sld)(090mil) Lf 42,709.000 48 672 6009 Refl Pav Mrkr Ty Ii-a-a Ea 836.000 49 672 6010 Refl Pav Mrkr Ty Ii-c-r Ea 131.000 50 3077 6012 Sp Mixes Sp-c Sac-a Pg64-22 Ton 22,985.000 51 3085 6001 Underseal Course Gal 46,729.000 52 6001 6002 Portable Changeable Message Sign Ea 2.000 53 6185 6002 Tma (Stationary) Day 82.000 54 6185 6003 Tma (Mobile Operation) Hr 300.000 55

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents