Similar Projects
Inspection, Testing, and Repairs of Aboveground and Underground Storage Tanks, NSA
Design
Crane, IN

I-65 Utility Extensions Division C Contracts 1 and 2
Infrastructure
Bidding
DeMotte, IN

I-65 Utility Extensions Division C Contracts 1 and 2
Infrastructure
Bidding
DeMotte, IN

NFPA Approved 1500 GPM Fire Well
Post-Bid
Granger, IN 46530

Water Distribution System Construction, Maintenance and Repair
Post-Bid
Evansville, IN

LTCP Phase 5 - South Region CSO Abatement
Results
Noblesville, IN 46060

ARV & Pump Station & Force Main Replacement
Results
Clarksville, IN 47129

2021 Griffith Water Meter Replacement
Infrastructure
Bidding
Griffith, IN

Cass Street Bottleneck Removal
Post-Bid
Peru, IN

I-69 / SR 64 South East Quadrant Sanitary Sewer - Phase 1
Results
$470,000 to $530,000 est. value
Princeton, IN 47670

Grease Interceptor Collection Services
Infrastructure
Bidding
Fort Wayne, IN 46895

2021 Utility Materials
Post-Bid
Elkhart, IN

Country Club Gardens Water Main Extension Phase 1
Results
Fort Wayne, IN 46802

Mill Race Sewer Improvements
Infrastructure
Bidding
Columbus, IN

Riley Pump Station Elimination
Post-Bid
Bedford, IN

Reported 10/22/2021 12:00 AM
Project Title

Water System Improvements

Physical Address View project details and contacts
City, State (County) Dana, IN   (Vermillion County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Sanitary Sewers, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project will be constructed in seven (7) contract divisions, which are defined and outlined as follows: Division I – New 75,000 Gallon Elevated Tank: Scope of work includes the erection of a new 75,000 gallon multi-column steel elevated stor-age tank and the demolition of the existing 65,000 gallon multi-col- umn elevated storage tank. Works also includes site piping, perime-ter fence, and site restoration.Division II – Water Supply and Treatment Facility Improve-ments:Scope of work includes replacing (2) well pumps, replacing the site piping at (2) wells, replacing the induced draft aerator, modifying the existing aerator detention tank, building an addition on the existing treatment building, upgrading electrical service to the treatment plant and wells, and replacing the electrical and controls at the treatment plant. Lastly, work includes new perim-eter fencing around (2) wells, site restoration and all temporary bypass piping.Division III – Water Meter Re-placement:Scope of work includes replac-ing the existing meters for all customers. Division IV – New Emergency Generator:Scope of work includes the instal-lation of an emergency generator and automatic transfer switch at the water treatment facility, as well as site restoration. Division V – Backwash Tank Modifications: Scope of work includes the installation of a drain line from the existing backwash holding tank to the sanitary sewer system and modifying the backwash holding tank, as well as site restoration.Division VI – Well #1 Abandon-ment and Building Demolition:Scope of work includes abandon-ing Well #1 and demolishing its building, as well as site resto-ration. Division VII – New Raw Water Transmission Main:Scope of work includes the in-stallation of approximately 1,150 lineal feet of new 6” raw water transmission main from the wells to the treatment plant and site restoration.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents