Similar Projects
DDPO Installation Data Drops and Power Outlet (DDPO) Installation
Renovation
Design
$1,000,000 CJ est. value
Chicago, IL 60612

CSSC Cooling System Upgrade
Renovation
Design
$500,000 CJ est. value
Lemont, IL 60439

Chicago Harbor Lock Parking Lot Resurfacing and Chicago Harbor Lock Building Interior Renovation
Infrastructure, Renovation
Bidding
$1,000,000 CJ est. value
Chicago, IL 60611

Y1DA--EHRM Infrastructure Upgrades Construction Marion, IL VAMC
Renovation
Bidding
$20,000,000 CJ est. value
Marion, IL 62959

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Various Small Construction Projects within the Boundaries of Great Lakes and Ohio River Divisions
Renovation, Addition, Demolition, Term Contract
Results
Less than $90,000,000 est. value
Chicago, IL - Louisville, KY - Detroit, MI - Allegany, Buffalo, NY - Nashville, TN - Huntington, WV

Mechanical Upgrade - Building #10
Renovation, Alteration
Results
Less than $4,000,000 est. value
Springfield, IL 62702

EHRM Infrastructure Upgrades West Campus - North Chicago - Construction
Renovation
Design
$50,000,000 CJ est. value
North Chicago, IL 60064

EHRM Infrastructure System Upgrades, Chicago, IL
Renovation
Bidding
$20,000,000 CJ est. value
North Chicago, IL 60064

FCA Correct Seismic Deficiencies Building 13
Renovation - 10,159 SF
Post-Bid
$5,000,000 CJ est. value
Marion, IL 62959

Upgrade Vehicle Exhaust, Replace Roofs, HVAC, and Windows Readiness Center Building Vehicle Maintenance Shop - Rebid
Renovation
Results
$1,822,000 CJ est. value
Milan, IL 61264

EHRM Infrastructure Upgrades - Hines
Renovation
Design
$100,000,000 CJ est. value
Hines, IL 60141

Renovate Basement to Support Unit Stationing Urbana Readiness Center - General
Renovation
Post-Bid
$800,000 est. value
Urbana, IL 61802

EHRM Training and Admin Space Support Construction - Marion VAMC
Renovation
Results
$2,109,000 CJ est. value
Marion, IL 62959

Last Updated 08/23/2023 06:31 PM
Project Title

Replace HVAC System and Rehab Plumbing System Kewanee Armory

Physical Address View project details and contacts
City, State (County) Kewanee, IL 61443   (Henry County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected October 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $4,195,000 [brand] Estimate
Plans Available from MEP Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work consists of removal and replacing the plumbing equipment, fixtures, and domestic water piping as well as upgrading the HVAC systems and providing new electrical connections to all equipment. The existing chiller and boilers will be removed along with hydronic piping throughout the building. A new VRF heat pumps system with ventilation air equipment will be installed. New kitchen ventilating hoods and associated systems will be provided. Roofing work associated with new rooftop equipment will be required. Asbestos containing material in the lobby will be removed. Lighting fixtures will be replaced with LED light fixtures and provided with updated controls. Single Prime Delivery Method: Either the Single Prime Bidder or a protected subcontractor must be listed for each trade provided on the Bid Form. Only one protected subcontractor may be listed for each trade. Failure to identify the name and bid proposal cost of each listed protected subcontractor on the provided Bid Form or providing more than one protected subcontractor for each trade will be a material deficiency (no time will be allowed after bid opening to remedy deficiency) and will result in the rejection of the bid. All protected subcontractors listed must be prequalified with CDB in accordance with CDB Standard Documents for Construction, Article 00 21 05. GENERAL - under $4,000,000 Prequalification. Bidders and protected subcontractors must be prequalified with CDB; allow 45 days for application processing B. MBE/WBE/PBE/VBE. MBE/WBE/PBE/VBE firms must be certified or registered with State of Illinois Commission on Equity and Inclusion as an MBE, WBE, PBE, or VBE prior to bidding. C. Prevailing Wage. Contractor shall not pay less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Prevailing Wage Act (820 ILCS 130/1-12). D. Registration with the Illinois Procurement Gateway (IPG). All new and renewing vendors that request either Architect/Engineer, Construction Manager/Program Manager, or Contractor prequalification must be an "Active (Accepted)" registrant in the IPG. Vendors not subject to prequalification renewal prior to time of bid may pre- register with the IPG and receive a vendor registration number. The IPG is a web based system that serves as the primary location for entering, organizing, and reviewing vendor information. The IPG allows prospective vendors to provide disclosures, registrations, and other documentation needed to do business with the State in advance of any particular procurement. E. Certifications and Disclosures. New vendors and vendors renewing prequalification must have an approved Illinois Procurement Gateway registration number and completed Form B. Vendors not subject to prequalification renewal prior to time of bid have the option to submit the Standard Certifications and Disclosure Form(s) (Form A) with bid at time of submittal. Failure to provide a completed Form A standard certifications and financial disclosure or Form B, be registered with the Illinois Procurement Gateway, will result in rejection of bid. F. Subcontractors. You are also required to submit disclosure forms and standard certifications for subcontractors not considered incidental to the performance of the contract with an annual value over $100,000 within 20 days of execution of your contract with CDB or execution of the contract between you and your subcontractor, whichever is later. A valid IPG registration number can be provided in lieu of hard copies of the standard certifications and financial disclosure forms. (See D. above.) Subcontractors must receive an Authorization to Proceed prior to performance of any work. G. Supplement to SDC. Bidders are advised to review Article 01 11 01, Supplement to SDC, for any revisions to the Standard Documents for Construction. H. Progress Payments. Progress payments will normally be issued by the Illinois Comptroller within 30 business days after CDB receives and approves an Invoice-Voucher. I. For Single Prime Delivery Method Projects: Any reference in the Specifications and the Drawings for Multiple Prime Trades shall be considered as the Prime Bidding Trade. J. Bid Protest. Bidder may submit a written protest to the Protest Review Office following the requirements of the Administrative Rules, 44 Ill. Adm. Code 8.2075. For protests related to specifications, the Protest Review Office must physically receive the protest no later than fourteen (14) days after solicitation or related addendum was posted to the Bulletin. For protest related to rejection of individual bids or awards, the protest must be received by close of business no later than fourteen (14) days after the protesting party knows or should have known of the facts giving rise to the protest.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents