Similar Projects
Replacement of Middleton Bridge over Schroon River
New Construction
Design
Bolton, Warrensburg, NY

Waterslide World Mixed Use Development
New Construction, Infrastructure
Design
$75,500,000 CJ est. value
Lake George, NY 12845

Seal Coating and Line Striping for Station 1 and Station 2
Infrastructure
Post-Bid
Queensbury, NY

Replacement of South Johnsburg Road (CR 57) Bridge over Mill Creek
New Construction, Infrastructure
Post-Bid
NY

Replacement of Palisades Road (CR 26) Over Brant Lake Inlet
Results
NY

Oxbow Hill Road and Moon Hill Road (CR 63) Rehabilitation and Reconstruction
Renovation
Results
NY

Ridge Road Townhouses
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Queensbury, NY 12804

New Community/Market Building
New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Glens Falls, NY 12801

Cold Milling Work Order Contract
Term Contract, Infrastructure
Post-Bid

Bridge Repair Project for 2021
New Construction
Results

Sun Valley Apartments
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Lake George, NY 12845

Replacement of Bay Road Bridge over Halfway Creek
New Construction, Infrastructure
Post-Bid
Queensbury, NY 12804

East River Drive (CR 16) and Call Street (CR 32) Rehabilitation
Infrastructure
Results
NY

Route 9N Mixed Use
Demolition, New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Lake George, NY 12845

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

Last Updated 10/25/2022 04:33 AM
Project Title

Dippikill Road and Glen Creek Road Over Glen Creek Bridge Replacement

Physical Address View project details and contacts
City, State (County) Johnsburg, NY 12853   (Warren County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Specs will not be available for download until October 3rd 2022 Dippikill Road and Glen Creek Road Over Glen Creek Bridge Replacement Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 2.6% Women Owned Sub-Contracting Goal: 6.9% Disadvantaged Owned Sub-Contracting Goal: 6%. Due date for questions 10/19/22 @ 12:00PM Contract term: Upon Completion If interested, please email or fax the first page of the bid invitation back to Jason Shpur, Deputy Purchasing agent at shpurj@warrencountyny.gov or 518-761-6395 (fax).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents