Similar Projects
D Street Improvements - City of Petaluma
Infrastructure
Conception
$3,500,000 est. value
Petaluma, CA 94952

South Taxilane B Rehabilitation - City of Petaluma
Infrastructure
Conception
$886,000 est. value
Petaluma, CA 94954

Clearwater at Windsor
New Construction, Infrastructure - 26,750 SF
Design
$74,000,000 CJ est. value
Windsor, CA 95492

Northpoint Commerce Center
New Construction, Infrastructure - 114,884 SF
Design
$12,500,000 CJ est. value
Santa Rosa, CA 95407

Dry Creek Ecosystem Restoration Project Phase II
Infrastructure
Bidding
$10,000,000 CJ est. value
Healdsburg, CA 95448

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Install Rock Slope Protection and Roadway Excavation
Infrastructure
Post-Bid
$1,410,000 est. value
CA

Six Fire Damaged Parks Recovery
Renovation, Infrastructure
Results
$1,439,185 to $1,749,004 est. value
Santa Rosa, CA 95401

Fulton Road from Guerneville Road to Piner Road Widen to Four Lanes
Infrastructure
Results
$14,300,000 est. value
Santa Rosa, CA

Fountaingrove Apartments
New Construction, Infrastructure
Construction
$90,000,000 CJ est. value
Santa Rosa, CA 95403

Fountaingrove Apartments
New Construction, Infrastructure
Construction
$90,000,000 CJ est. value
Santa Rosa, CA 95403

Lago Fresca Apartments
New Construction, Infrastructure - 72,535 SF
Pending Verification
$20,000,000 CJ est. value
Santa Rosa, CA 95405

Tru Santa Rosa Optimal Hotel
New Construction, Infrastructure - 83,435 SF
Pending Verification
$25,000,000 CJ est. value
Santa Rosa, CA 95403

Rivertrail - 101/Crossing Crosstown Connector - City of Petaluma
Alteration
Conception
$3,083,000 est. value
Petaluma, CA 94952

Mckinley Elementary School New Modular Classrooms
New Construction, Infrastructure - 1,200 SF
Design
$2,440,000 CJ est. value
Petaluma, CA 94952

Last Updated 04/10/2023 11:04 AM
Project Title

Brooks Road South at Natalie Drive Pedestrian Crossing Project

Physical Address View project details and contacts
City, State (County) Windsor, CA 95492   (Sonoma County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $369,708 [brand] Estimate
Plans Available from Municipal Agency - 02/19/23
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of the placement of curb ramps and associated sidewalk, asphalt concrete conform, enhanced crosswalk signage, median refuge island, slurry seal, traffic striping, and such other items of work necessary to complete the work. Each bid shall be accompanied by a certified or cashiers check payable to the Town of Windsor or a satisfactory bidders bond in favor of the Town of Windsor executed by the bidder as principal, and a satisfactory surety company, licensed as such in the State of California, as surety, in an amount not less than 10% of the maximum amount of the bid. The check or bidders bond shall be given as a guarantee that the bidder shall execute the contract, if awarded to him, in conformity with the contract documents and shall provide the statutory faithful performance bond, and labor and materials (payment) bond for 100% of the contract price, conditioned upon the faithful performance of said contract, said bonds to be provided within ten (10) days, not including Saturdays, Sundays, and legal holidays, after notification of the award of the contract to the bidder.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents