Similar Projects
Minnesota Medal of Honor Memorial - Mechanical
Bidding
$558,000 est. value
Saint Paul, MN

Boiler Maintenance and Repairs
Bidding
Minneapolis, MN

OWEF - Boilers Comprehensive Ultrasonic Thickness Testing
Term Contract
Post-Bid
Rochester, MN 55904

Nicollet Public Schools Mechanical Equipment - Supply
Post-Bid
Mankato, MN

Steam Boiler Replacement at MCF Red Wing
Results
Less than $1,963,759 est. value
Red Wing, MN 55066

JFK Elementary School 2021 Mechanical Upgrades
Results
Lakeville, MN 55044

MnDOT Northfield Truck Station Campus - Electrical and Mechanical
Bidding
$4,674,000 est. value
Northfield, MN 55057

Chiller Maintenance
Post-Bid
Minneapolis, MN

2021 Mechanical Upgrades
Results
Lakeville, MN 55044

MnDOT HRTC Mech Sys Maint, Test, Repairs
Term Contract
Post-Bid
Shoreview, MN 55126

Owatonna 2021 Multi-site Mechanical Upgrades
Results
$900,000 est. value
Owatonna, MN 55060

Chiller and Boiler Water Chemical Treatment Services
Post-Bid
Minneapolis, MN

Valley View Elementary School Boiler Plant
Results
Columbia Heights, MN 55421

Boiler Repair Services
Post-Bid
Saint Paul, MN 55106

Repair Buildings 1 and 2 at MVH - Electrical and Mechanical
Results
Less than $230,000 est. value
Hastings, MN 55033

Reported 03/20/2021 12:00 AM
Project Title

Furnish and Install Walk in Cooler and Freezer at Bureau of Criminal Apprehension

Physical Address View project details and contacts
City, State (County) Saint Paul, MN 55106   (Ramsey County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $165,000 to $185,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To furnish and install one (1) - 20x20 foot walk in cooler and one (1) 20x20 foot walk in freezer in the central evidence vault area. The cooler and freezer will be located in the northeast corner of the vault, inside the west segment of the vault. Shelving will be removed by BCA staff prior to installation. The freezer and cooler must have temperature controls installed that are compatible with the current Distech Temperature Control System. The State will make the sole determination as to whether a proposed alternate temperature control system is an approved equal. To minimize the risk, the equipment to be installed in the coolers must include two condensers, in the event one of the condensers fail. Installation must be done strictly according to attached drawings and specifications shown in Exhibit C. The coolers must start-up and be completely operational and performing as designed at the completion of this project.

Details

Division 11 - Equipment, Foodservice Storage Equipment, Walk-In Coolers, Walk-In Freezers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents