Similar Projects
15th Street (Summit to Dakota) - City of Yankton
Infrastructure
Conception
$1,374,000 CJ est. value
Yankton, SD 57078

21st (Summit to Wclr) - City of Yankton
Infrastructure
Conception
$300,000 CJ est. value
Yankton, SD 57078

Asphalt Surface Treatment
Infrastructure
Bidding
$1,300,000 CJ est. value
Yankton, SD 57078

RFQ Design - Architectiure and Engineering Services for MCN Campus, Stock Dam Removal Human Services Center
Renovation, Infrastructure
Post-Bid
$300,000 CJ est. value
Yankton, SD 57078

Douglas Avenue Reconstruction from Levee Street to 2nd Street
Infrastructure
Post-Bid
$600,000 CJ est. value
Yankton, SD 57078

Sanitary Sewer System Improvements - Rebid
Infrastructure
Results
$4,593,294 CJ est. value
Gayville, SD 57031

Summit Street ( 8th to 9th ) - City of Yankton
Infrastructure
Conception
$300,000 CJ est. value
Yankton, SD 57078

Yankton Early Childhood Center - Bid Package #2 - Civil
New Construction, Infrastructure - 80,000 SF
Post-Bid
$26,000,000 CJ est. value
Yankton, SD 57078

7th Street (Broadway to Maple) - City of Yankton
Infrastructure
Conception
$325,000 CJ est. value
Yankton, SD 57078

BRF 6213(00)22-1, PCN 08XM
Demolition, New Construction, Infrastructure
Post-Bid
$8,756,100 CJ est. value
Lesterville, SD 57040

Cedar Street (4th to 8th ) - City of Yankton
Infrastructure
Conception
$450,000 CJ est. value
Yankton, SD 57078

Mead Property Development Streets, Utilities, and Site Plan
Infrastructure
Post-Bid
$4,300,000 CJ est. value
Yankton, SD 57078

Walnut Street From 8th Street to 15th Street - City of Yankton
Infrastructure
Conception
$450,000 CJ est. value
Yankton, SD 57078

Tennis Court Surface Preparation and Resurfacing
Infrastructure
Post-Bid
$500,000 CJ est. value
Yankton, SD 57078

Cedar Street From (2nd Street to 4th Street) - City of Yankton
Infrastructure
Conception
$500,000 CJ est. value
Yankton, SD 57078

Last Updated 03/31/2023 01:14 PM
Project Title

Lewis & Clark Behavioral Health Facility / Yankton

Physical Address View project details and contacts
City, State (County) Yankton, SD 57078   (Yankton County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Assisted Living Facility, Site Development
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

All bidders are encouraged to attend. Each bid shall be accompanied by a certified check, cashier's check or corporate surety bond in the amount of at least five (5) percent of the amount of the bid, payable to Lewis & Clark Behavioral Health Services as a guarantee that if the proposal is accepted, the bidder will execute the contract and file the required bonds within ten (10) days after notice of award of contract. As of March 9, 2023, this project is currently out for general contractor re-bidding.

Details

1 Story Above Grade, 59,607 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents