Similar Projects
Wet Utilities Job Order Contract-Multiple Locations
Demolition
Design
$2,000 to $1,000,000 est. value
Washington, DC - Indian Head, Patuxent River, MD - Dahlgren, VA

Water Distribution System Valve Replacement Phase 1
Infrastructure
Bidding
Portsmouth, VA

Provision and Installation of Water Mains - As Needed
Term Contract
Bidding
Vienna, VA

Construction of Columbus Loop Tanks Valve and Site Improvements Phase II
Post-Bid
Virginia Beach, VA 23462

On-Call Wet Utlities Services
Post-Bid
Alexandria, VA

Troutville Meter System
Results
Troutville, VA

College Creek Water Main Crossing
Results
Williamsburg, VA

Patrick's Creek Water Project
Infrastructure
Bidding
Yorktown, VA 23692

Water Meters
Post-Bid
VA

Routine and Emergency Construction Services
Term Contract
Results
Staunton, VA

New Hope Road Water Line Replacement
Infrastructure
Bidding
Staunton, VA 24401

Large Domestic and Fire Line Water Meters
Post-Bid
VA

Shenandoah Raw Water Line Project - Three Springs Road to Longley Road
Results
Harrisonburg, VA

Herndon Parkway Water Main Replacement Project
Infrastructure
Bidding
Herndon, VA

Perform Advanced Metering Infrastructure (AMI) Maintenance
Post-Bid
Portsmouth, VA

Reported 11/04/2021 12:00 AM
Project Title

TRWTF Flow Meters and Sample Lines

Physical Address View project details and contacts
City, State (County) VA   (Loudoun County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of installing two new taps on Clearwell effluent pipes that are approximately 18 feet deep; installing approximately 300 LF of 1-inch copper pipe (sample lines; installing a new sample pump in the existing manhole and associated controls; installing an owner furnished 24-inch electromagnetic flow meter to replace the existing 24-inch Venturi flow meter and a new mounting rack; installing an owner furnished 24-inch butterfly valve within the meter vault downstream of Clearwell 2; installing approximately 500 LF of 1-inch flexible PVC braided pipe through the existing conduits and manholes; installing a new mounting rack, on-line chlorine residual analyzer, pH meter, drain pipe, and associated plumbing and electrical work inside the operations building; site electrical work; and providing all other work.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents