Similar Projects
Electrical Services
Bidding
Atlanta, GA

City Hall Generator Transfer Switch Installation
Bidding
Milton, GA 30004

Holland Plant Boiler Power Separation
Post-Bid
Atlanta, GA 30313

2.0-18.0GHz RF Amplifier K10391-3
Post-Bid
Atlanta, GA 30334

Power Distribution Material (Transformers)
Results
Less than $668,019 est. value
College Park, GA

Electrical Switchgear Replacement
Term Contract
Results
Atlanta, GA 30303

Boggs Transformer Replacement and Switchgear Improvements
Bidding
GA 30318

Uninterruptible Power Supply Equipment Repair
Post-Bid
Atlanta, GA 30324

Annual Contract for Electrical Testing and Inspection Services
Term Contract
Results
Atlanta, GA 30303

Prequalified Contractors List
Post-Bid
East Point, GA

Fixture Installations at Heritage Academy
Results
Atlanta, GA

Ultraviolet Disinfection System and Related Components
Post-Bid
Atlanta, GA 30303

Douglass High Replacement of Dimmer Panel
Results
Atlanta, GA 30318

IVS Configurable Power Supply
Post-Bid
Atlanta, GA 30332

Douglass High Replacement of Can Lights to Led
Results
Atlanta, GA 30318

Last Updated 09/03/2020 08:30 AM
Project Title

Laguna Panel Installation

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30324   (Fulton County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $190,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of electrical equipment for MARTA’s Building and Support Department.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents