Similar Projects
Williamsburg Street Redevelopment - City of Aiken
Alteration
Design
$9,000,000 est. value
Aiken, SC 29801

Widening - SC 126 - Aiken County
Infrastructure
Bidding
$12,000,000 CJ est. value
Clearwater, SC 29841

Widening - SC 126 - Aiken County
Infrastructure
Bidding
$12,000,000 CJ est. value
Clearwater, SC 29841

Wagener-Salley High School - Building and Finishes Package
New Construction, Infrastructure - 151,608 SF
Sub-Bidding
$55,000,000 CJ est. value
Wagener, SC 29164

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

World-Wide Water Storage Tank Remediation
Term Contract
Results

Area 1 Detention Pond Clearing Project
Infrastructure
Results
SC

PAM Health Rehabilitation Hospital of Aiken
New Construction, Infrastructure
Pending Verification
$26,904,973 CJ est. value
Aiken, SC 29801

Chester White Solar Project
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Aiken, SC 29801

2023 Paving and Resurfacing
Infrastructure
Bidding
$150,000 CJ est. value
North Augusta, SC 29841

Sitework Package for Highland Springs Elementary/Middle School - Phase 1
Infrastructure
Post-Bid
North Augusta, SC 29841

Rehabilitation - Aiken Co
Infrastructure
Results
SC

University Parkway Widening - South Carolina Department of Transportation
Infrastructure
Pending Verification
$4,000,000 CJ est. value
Aiken, SC 29801

Animal Shelter Storage Building
New Construction, Infrastructure
Bidding
$33,500 CJ est. value
Aiken, SC 29801

Last Updated 11/15/2022 09:36 AM
Project Title

Town of Monetta - Elevated Storage Tank

Physical Address View project details and contacts
City, State (County) Monetta, SC 29105   (Aiken County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected May 2023 , Request For Proposals, Construction documents
Bids Due View project details and contacts
Estimated Value $1,324,581 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of November 15, 2022,The job has not been awarded as yet. The bids were over budget. No definite date for the rebid.** Construction of a 150,000-gallon steel elevated water storage tank, foundation, yard piping, electrical/SCADA, related appurtenances, chain link fencing with gates, grading, and site work at the new tank site Installation of an altitude valve and vault at an existing water storage tank

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents