Similar Projects
Applied Research Building
New Construction - 60,000 SF
Construction
Less than $33,000,000 est. value
Phoenix, AZ

Construction Manager at Risk (CMAR) Services - Life Science / Physical Science Remodel and Building Additions - South Mountain Community College
Renovation, Addition
Results
$11,500,000 est. value
Phoenix, AZ 85040

Notre Dame Prep Performing Arts Theater f/k/a/ St. Catherine of Bologna Performing Arts Center
New Construction - 19,672 SF
Construction
$6,800,000 est. value
Scottsdale, AZ 85260

Tempe New Academic Building
New Construction - 143,000 SF
Results
Less than $58,000,000 est. value
Tempe, AZ

Mcccd Phoenix College Building A Remodel
Post-Bid
Phoenix, AZ 85013

Phoenix College Building-A Remodel
Renovation - 26,400 SF
Results
Less than $2,477,566 est. value
Phoenix, AZ 85013

Durham Hall
Renovation - 137,065 SF
Construction
Tempe, AZ 85281

Rio Salado College Tower, 3rd Floor Remodel
Renovation
Results
$1,500,000 est. value
Tempe, AZ 85281

University Building 4th Floor Tenant Build-Out
Renovation, Infrastructure
Post-Bid
Gilbert, AZ 85233

University Building 4th Floor Tenant Build-Out
New Construction
Post-Bid
Gilbert, AZ 85233

General Construction for the Gorman Classroom Building Interior Renovation Project
Renovation
Results
Aguila, AZ

Tempe Campus Student Housing Renovations
Renovation
Conception
Tempe, AZ 85281

Tempe Campus Core Support Research Facility
New Construction
Conception
Tempe, AZ 85281

West Campus Student Housing Academic/Office Space
New Construction
Conception
Glendale, AZ 85306

Polytechnic Campus Student Union Expansion
Renovation, Addition - 65,000 SF
Conception
Mesa, AZ 85212

Reported 10/29/2021 04:58 PM
Project Title

Estrella Mountain Community College - Komatke Hall Remodel, Phase I

Physical Address View project details and contacts
City, State (County) Avondale, AZ 85392   (Maricopa County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value $1,750,000 to $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Phase 1 work involves the interior remodel of the major portion of KOM-A including the Plaza Gallery restrooms. The scope of work includes demolition and replacement of interior partitions, HVAC, electrical, plumbing, interior glazing, lighting and ceiling systems, fire alarm modifications and design and reconfiguration of the existing sprinkler system where required. The scope of work also includes structural masonry work for a new wall opening and east entrance and roof canopy.

Details

College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents