Similar Projects
Tenth Street HMA Pavement Improvements
Infrastructure
Design
$340,103 CJ est. value
Saint Clair, MI 48079

Tenth Street HMA Pavement Improvements
Infrastructure
Design
$340,103 CJ est. value
Saint Clair, MI 48079

Fire and Water Department Paving Project
Post-Bid
Fair Haven, MI

2021 Street Improvements
Post-Bid
Yale, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Asphalt Paving Project - Smiths Creek Landfill
Results
Smiths Creek, MI 48074

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Cuttle Road Reconstruction Project - Shamrock Lane to Pauls Court
Results
Less than $512,767 est. value
Marysville, MI 48040

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

Calumet-Swedetown Trail Capping, And Route Grading
Results

Pre Qualified Maintenance - Cold Water Welcome Center-HMA-I-69
Infrastructure
Post-Bid

Robbins Street Road And Water Main Replacement
Results
Algonac, MI

Up to 196.32 Lnmi of Hot Mix Asphalt Crack Treatment
Infrastructure
Post-Bid

Share Street Reconstruction & Watermain Replacement 2021
Results
Saint Clair, MI

Pit Cleaning-Bascule Bridges, Multiple Services
Infrastructure
Post-Bid

Last Updated 09/02/2022 09:06 AM
Project Title

2022 Water System Improvements Project - South Area

Physical Address View project details and contacts
City, State (County) East China, MI 48054   (Saint Clair County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,998,798 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The estimated cost is $5,108,881.00 Major items of work and approximate quantities are as follows: Remove and Replace, Valve in Box, 6"-10" 48 EA Remove and Replace Pavement 19,135 SFT Remove and Replace Concrete Curb 335 LF Remove and Replace Gravel, 12" 16,032 SFT Remove Hydrant 23 EA Hydrant Installation 34 EA Abandon Valve and Box 18 EA Ductile Iron Pipe, 8" 242 LF C-909 CL235 Water Main, 8" and 12" 12,094 LF C-909 CL235 Water Main, 12", Jack and Bore 70 LF Corrugated Metal Pipe, 12" and 15" 162 LF Water Services 305 EA Tapping Sleeves, Valve and Box, Sizes varies 14 EA Water Main Connections, 4"-10"" 17 EA Together with traffic control and other related work items such as driveway and road removal and replacement, connections to existing water main, etc. Bonding Requirements - Bid Bond 5 % The Township of East China reserves the right to accept or reject any or all bids, either in whole or in part, to waive any irregularities, and to make the award in any manner considered by the Township to be in its best interest. No bid may be withdrawn for a period of 45 calendar days after the date and time of bid opening. Questions are submitted online No

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents