Similar Projects
North Ankeny Boulevard Water Main
Infrastructure
Bidding
$116,000 est. value
Ankeny, IA 50023

SE Trail Ridge Road Water Main
Infrastructure
Bidding
$630,000 est. value
Grimes, IA 50111

Commerce Crossings Development Public Improvements
Infrastructure
Post-Bid
Bondurant, IA

Merle Hay Road and Johnston Drive Improvements
Infrastructure
Post-Bid
Johnston, IA

8th Street SE Water and Sewer Extensions
Results
$1,463,902 est. value
Altoona, IA

South Grand Prairie Parkway - Stagecoach Drive to Grand Avenue
Infrastructure
Results
WDM, IA 50266

2022 Water Main Replacement
Infrastructure
Post-Bid
West Des Moines, IA

City of Grimes SE Jacob Street Water Main
Infrastructure
Results
$679,000 est. value
Grimes, IA 50111

2021 Water Main Replacements
Infrastructure
Results
Less than $806,150 est. value
Altoona, IA

Crossroads Park Parking Lot and Water Quality Improvements
Infrastructure
Results
West Des Moines, IA 50266

South East Crosswinds Drive RISE - Phase 2
Infrastructure
Results
$2,780,342 est. value
Ankeny, IA 50021

2021 Cowles Drive Reconstruction - Phase 2 and 3
Infrastructure
Results
$12,500,000 est. value
Des Moines, IA 50321

North 3rd Street and Vista Lake Avenue Intersection Improvements
Infrastructure
Results
$1,543,935 est. value
Polk City, IA 50226

Ankeny IA SE 3rd Street Utility Improvements
Infrastructure
Results
Ankeny, IA 50021

Martha L. Miller Drive East Extension
Infrastructure
Results
Pleasant Hill, IA 50327

Last Updated 04/19/2022 11:34 AM
Project Title

Camp Dodge S-40 Raw Water Transmission Main

Physical Address View project details and contacts
City, State (County) Johnston, IA 50131   (Polk County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of new 8-inch raw water mains from Well Numbers 7 and 8 to near the Camp Dodge Water Treat Plant including all labor, materials, and equipment necessary for the installation of 1100 feet of 8-inch raw water main in open cut, 2000 feet of 8-inch raw water main in trenchless construction, gate valves, bends, tee fittings, four cleaning ports, improvements at Well Numbers 7 and 8, miscellaneous sanitary sewer and storm sewer removal and replacement, HMA and sidewalk removal and replacement, restoration of disturbed surfaces, erosion control and miscellaneous associated work, including cleanup

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents