Similar Projects
Lift Station Pump Remediation
Term Contract
Bidding
Raleigh, NC 27610

First Avenue Pond and Pump Station
Bidding
Indian Trail, NC 28079

Idols Road Lift Station
Post-Bid
Winston-Salem, NC

Progressive Design-Build Services for Mount Holly Pumping Station and Force Main
Post-Bid
Charlotte, NC

DE Benton WTP Finished Water Pump Station 6MGD Pump Addition
Results
Garner, NC

Highway 209 - I-40 Sewer Project
Results
NC

NHRMC Emergency Well House
New Construction - 1,211 SF
Construction
$68,323 est. value
Wilmington, NC 28403

Pump Station #26 And Pump Station #27 Improvements
New Construction
Construction
$500,000 est. value
Wilmington, NC 28401

Pump Station No.19 Improvements
Bidding
Laurinburg, NC 28353

Waxhaw Marvin Pump Station Decommissioning
Post-Bid
Monroe, NC

University Lake Raw Water Pump Station Capacity Improvements
Results
$14,000 to $1,800,000 est. value
Carrboro, NC

First Avenue Pond and Pump Station
Bidding
Indian Trail, NC 28079

Dimminutor Open Channel Comminutor- Henderson Pump Station
Post-Bid
Jacksonville, NC

Water and Wastewater Collection System Improvements
- 3,000 SF
Results
Less than $1,245,988 est. value
Micro, NC

Highway 11 and Grifton Pump Station Improvements
Post-Bid
Grifton, NC

Reported 04/19/2019 12:00 AM
Project Title

Unionville Pump Station

Physical Address View project details and contacts
City, State (County) Monroe, NC   (Union County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description Project consists of replacement of an existing submersible sewage pump station located at and serving Unionville Elementary School as summarized below on a lump sum bid. A. New pump station including installation of all equipment and all necessary testing. B. Connection of new pump station to existing force main. C. Installation of gravity sewer line to existing pump station and flow diversion to new pump station. D. Demolition of existing pump station. E. Related site grading and erosion/sediment control measures.
Details
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents