Similar Projects
Carpet and Tile Installation and Removal
Term Contract
Post-Bid
Buffalo, Orchard Park, Williamsville, NY 14203

Suspended Ceiling Tile and Grid Replacement
Post-Bid
Williamsville, NY 14221

Eden Central School District - Capital Outlay Project 2018-2019
Results
Less than $100,000 est. value
Eden, NY 14057

Permit Room Rehabilitation
Results
Buffalo, NY 14219

Frontier CSD Capital Outlay Project - Pinehurst Elementary School
Post-Bid
Lake View, NY

Metro Babcock Street Bus Garage T-Beam Repair
Results
Less than $75,000 est. value
Buffalo, NY 14206

Interior Signage for Buckham Hall at Buffalo State College
Alteration
Post-Bid
Buffalo, NY 14222

Interior Painting and Finishes Restoration
Results
Buffalo, NY 14210

Removal of Audiology Sound Booths in Building 16
Demolition
Post-Bid
Less than $50,000 est. value
Buffalo, NY 14224

P-Tech Makeover and Signage
Results
West Seneca, NY 14224

Cheektowaga Sloan UFSD Capital Outlay Project 2021-2022
Alteration
Post-Bid
Buffalo, NY 14212

Eden Central School District Capital Outlay Project 2019-2020
Results
Eden, NY 14057

Abate ACM Plaster, Building, 10/Block B, 11/Block A and 13/Block D at Wende CF
Results
$1,000,000 to $2,000,000 est. value
Alden, NY 14004

Clemens Hall - Stair Tower Improvements at SUNY Buffalo
Results
Buffalo, NY

Capital Outlay Project 20/21
Results
Depew, NY 14043

Last Updated 12/22/2021 09:25 AM
Project Title

University at Buffalo, Ellicott Complex Electrical Upgrades Phase 3 - Richmond Quad including Asbestos and Hazardous Materials Abatement

Physical Address View project details and contacts
City, State (County) Buffalo, NY 14228   (Erie County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $1,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work associated with this project consists of, but is not limited to, the following: Replacement of main switchboard, main distribution panelboards, and associated feeders and branch circuits. Replacement of existing lighting and appliance panelboards. Replacement of existing transformer and associated feeders. Retrofit existing fluorescent strip lighting in corridors and stairwells with LED retrofit kits. Retrofit existing incandescent downlights with LED retrofit kits. Retrofit existing stairwell lighting with LED retrofit kits. Replacement of existing exist signs throughout building. Replacement of existing electrical room door. Removal and legal disposal of existing hazardous materials.

Details

Division 02 - Existing Conditions, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.
Division 07 - Thermal and Moisture Protection.
Division 09 - Finishes.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents