Similar Projects
Beach Park and Beers Street Outfall Improvements
Post-Bid
Keyport, NJ 07735

Sylvan Lake Living Shoreline Project
Post-Bid
Avon-by-the-Sea, NJ 07717

Repairs to Culvert 5 and Culvert 6 and Related Site Work on the Union Transportation Trail
Results
$225,000 to $300,000 est. value
NJ

Deal Avenue Bulkhead Replacement
Results
Oceanport, NJ 07757

2018 Roadway Drainage Improvements, Contract 2
Post-Bid
Middletown, NJ 07748

Maintenance Timber/Underwater/Drainage Structural Repair Contract, Central - 2019; Various Locations; Hunterdon, Mercer, Middlesex, Monmouth, Ocean, Somerset and Warren Counties
Results
$5,000,001 to $10,000,000 est. value

Washington Avenue Outfall Improvements in the Borough of Spring Lake
Post-Bid
Spring Lake, NJ 07762

Drainage Restoration Contract, Statewide-2018; Various Sites Statewide
Results
$5,000,001 to $10,000,000 est. value

Port Monmouth Hurricane and Storm Damage Reduction - Phase II, Contract 4A
Post-Bid
$1,000,000 to $2,000,000 est. value
Port Monmouth, NJ

Portland Place Shoreline Stabilization Hartshorne Woods Park
Results
$750,000 to $900,000 est. value
Lincroft, NJ 07738

Sea Bright to Manasquan, NJ, Project
Post-Bid
$25,000,000 to $30,000,000 est. value
Manasquan, NJ 08736

2018 Drainage Improvement Project
Results
Marlboro, NJ 07746

Port Monmouth, Phase 2, Contract 4A
Post-Bid
$2,000,000 to $3,000,000 est. value
Port Monmouth, NJ 07718

Camp Evans Drainage Improvements
Results
Wall, NJ 07719

Installation of Some Minor Drainage, Fencing, Crushed Stone Walkways
Post-Bid
Red Bank, NJ

Reported 08/26/2019 09:01 AM
Project Title

Drainage Improvements at Jennie Parker Manor

Physical Address View project details and contacts
City, State (County) Highlands, NJ 07732   (Monmouth County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Exterior Site work: Remove and replace 420 sq.ft. of concrete paving 4” thick; Install 16’ of 6” trench drain. Interior Boiler Room: Rear Wall; Saw cut and demo 26 ln.ft. of concrete floor and remove 45 sq.ft. of concrete; Install 24ln.ft. of 4” trench drain and install 40 sq.ft. of concrete 4” thick; Trench drain to terminate into new sump pit; Provide and install 30’ of 2” Schedule 40 PVC, above ground piping with [1] check valve; Trench Drain: non-sloped, with stainless or aluminum grating rated for pedestrian traffic; 6” wide x 4” deep (exterior), 4” wide x 4” deep (interior). Sump Pit: Zoeller Model 4NW29 18.0gal
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents