Similar Projects
Hydraulic Turbine Mechanical Maintenance and Repairs On-Call Services Annual Contract
Term Contract
Bidding
Holyoke, MA

Supply and Installation of Replacement Split A/C System
Post-Bid
Less than $30,000 est. value
Wilbraham, MA 01095

Removal and Replacement of Reznor RA 235 Existing Unit
Post-Bid
Less than $14,000 est. value
Chicopee, MA

Repair HVAC, Marine Reserve Center
Results
$250,000 to $500,000 est. value
Chicopee, MA 34996

Boiler Replacement, The Pines 667-2
Results
Less than $71,883 est. value
Wilbraham, MA

Bowe School Ventilation Repairs
Pending Verification
$300,000 est. value
Chicopee, MA 01013

Installation of New HVAC Equipment, Piping and Controls
Post-Bid
Less than $165,000 est. value
Chicopee, MA

On Call HVAC Preventive Maintenance and Repair
Term Contract
Results
Less than $300,000 est. value
Longmeadow, MA

Installation of New HVAC Equipment, Piping and Controls
Post-Bid
Less than $165,000 est. value
Chicopee, MA

Power Piping Systems and HVAC Maintenance, Installations and Repairs
Term Contract
Results
Holyoke, MA

Air Vent Cleaning of Aviation Hangars
Post-Bid

Automated Logic Controls Installation at Glenbrook Middle School
Results
$37,994 est. value
Longmeadow, MA

HVAC and Mechanical Products
Term Contract
Post-Bid

Automated Logic Controls Installation at Williams Middle School
Results
$39,129 est. value
Longmeadow, MA

Replacement Of Existing Dual Fuel Heating Boiler
New Construction
Post-Bid
Holyoke, MA 01040

Reported 12/18/2021 12:00 AM
Project Title

Mass Mutual Center Air Handling Unit Repair Project - General Bids

Physical Address View project details and contacts
City, State (County) Springfield, MA 01103   (Hampden County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $4,700,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. The project consists of repair to six (6) existing air handler units at Mass Mutual Center (MMC),which shall include, but not be limited to, demolition of existing systems; installation of new systems; and repair and refinishing of all disturbed areas to match existing.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents